Orange County NC Website
97 <br /> d. A written, signed agreement between a developer, Orange County, <br /> and the Town of Hillsborough shall be executed describing the <br /> timing, phasing, design, and financing of public water distribution <br /> and public sanitary sewer collection mains. <br /> 4. In addition to the requirements of Section 2.5 Site Plan Review of the <br /> UDO, development applications within the Project shall provide the <br /> following additional information as part of the site plan application process: <br /> a. For development of structures, vehicular use areas, roadways, <br /> and/or utility installation(s), an Environmental Assessment shall be <br /> completed in accordance with the provisions of Section 6.16.3 of <br /> the UDO regardless of the proposed land disturbance. <br /> b. For development of structures, vehicular use areas, and roadways, <br /> a Transportation Impact Analysis (TIA) shall be completed in <br /> accordance with Section 6.17 of the UDO regardless of anticipated <br /> traffic counts for the development. TIAs shall include the following <br /> additional information: <br /> i. A review and analysis of required internal and/or external <br /> roadway improvements for consistency with the previously <br /> prepared TIA reviewed as part of this Project, <br /> ii. Weekend traffic count data for similar mixed use <br /> developments within the area. <br /> c. Documentation outlining proposed and/or existing cumulative <br /> impervious surface area as well as building/open space ratios with <br /> the Project. <br /> d. Documentation denoting approval of proposed mail kiosk locations <br /> by the Postmaster General and the North Carolina Department of <br /> Transportation. <br /> Documentation denoting anticipated daily water and sewer needs <br /> for proposed land uses. <br /> e,f.Documentation indicating the Town of Hillsborough has reviewed a <br /> site plan application package and determined there is sufficient <br /> water and sewer capacity to serve the project. A lack of water <br /> and/or sewer capacity shall result in the denial of the site plan <br /> application by the County.2 <br /> f,g_In addition to the standards detailed in Section 2.5 of the UDO, all <br /> landscaping plans shall include information denoting the proposed <br /> method of care (i.e. underground sprinklers, maintenance <br /> personnel, etc.) for the development. <br /> Language added by Planning Board at its October 4,2017 regular meeting. The applicant has expressed no <br /> objections to the revision. Please refer to Attachment 5. <br /> 2 Condition added by Planning Board at its October 4,2017 regular meeting. The applicant has expressed no <br /> objections to the revision. Please refer to Attachment 5. <br />