Orange County NC Website
84 <br /> Craig Benedict said that the regulations that the County has put together, in anticipation of this land use <br /> implementation that has been on the map since the '80s, takes into account the impacts that community members <br /> voiced. Traffic-wise, road capacity is evaluated by the TIAs. When traffic from this project meets certain thresholds, <br /> the developer has to make improvements. Mr. Benedict said that this is not a case where the project continues and <br /> someone else fixes the project later. Many residents raised concerns about lighting. Orange County has one of the <br /> best"dark sky" ordinances in North Carolina. The lighting program in Section 6.11 of the UDO requires that light be <br /> limited and directed down. In terms of the environmental issues, the site-by-site EIAs will be considered alongside <br /> master planning for stormwater management which protects the water table. Even though wells are permissible <br /> within the development, they may not necessarily have to install them. It could be the case that stormwater areas <br /> down to groundwater could provide the water for irrigation and other landscaping. <br /> Tony Blake asked if there is something that can be done to restrict the amount of water used from a well during a <br /> drought. He acknowledged the technical solutions but asked if verbiage could be added to address the issue. <br /> Craig Benedict responded the water table in Orange County is not in the typical stratospheric table seen in other <br /> parts of the country. It is in granite. The creation of a well is about hitting the right cracks in the rock. Since there are <br /> some adjacent properties with wells that are outside of this project, if there are wells are requested in the future for <br /> landscaping, Staff can direct the developer to an area with the least susceptibility of affecting nearby wells. <br /> Tony Blake said that there could be something codified about this issue. <br /> Craig Benedict noted that the protections as part of the MPD-CZ are more intense than in general use zoning. The <br /> amount of uses allowed in a master plan development is a restricted list from the full list in the Table. There are more <br /> precautions in a MPD-CZ, with traffic impacts, and more comprehensive development that is a value to everybody <br /> and to the surrounding Towns, and people who use the roads in the area. This type of project takes a better look at <br /> all of the impacts on-site and off-site. <br /> Kim Piracci said that she understands that it has been established that the County has and wants to develop this <br /> area, and this is a valuable area. She asked if developers tell Board members what they are planning to do with this. <br /> Craig Benedict replied that there is not going to be 272 acres of development all at once. The perimeters will be set <br /> with approved zoning and then the developer will market the property. In this case, there is not a specific site plan or <br /> use that says that an Ikea is coming here; it is not this type of proposal. This type of proposal develops the road <br /> pattern - the utility pattern, the use pattern, the buffer pattern, and other such patterns. Once something like this is <br /> established, there will be more activity and will be prepared to a higher level than in the past for the advent of the <br /> infrastructure being put into this area. In the early '80s, 1-40 was not there. The impact of 1-40 spurred interest in <br /> creating an interchange and jobs. This project will likely feed off of the interstate with people going to work from the <br /> rural areas of the County. The traffic here is interstate-related to a large degree. <br /> Kevin Nicholson said that he lives at 1006 Davis Rd. He said that he is part of the sixth generation living on his <br /> property; he lives in his grandfather's house. He raises chickens, cows and has a farm (farm use value program). <br /> This proposed development within a mile of the house. He said that he can remember a time when there was a <br /> proposal to widen Davis Rd. to 5 lanes. Everybody from his family and in community fought this proposal off. Is there <br /> a plan to widen Davis Rd.with this project? He knows that something will have to be done with Old 86 eventually. <br /> Jim Parker said that his project is not proposing the widening of Davis Rd. <br /> Craig Benedict said that there is long range planning for road patterns. Based on the long range planning going on, <br /> he can say that there are no long-range plans to widen Davis Rd. but there are plans to widen NC-86 over the long- <br /> term and short-term. The road between Old 86 and new 86 through the Waterstone development was part of the <br /> Planning Department's planning efforts 15 years ago. There may be a traffic light at Davis Rd. someday, when it <br /> meets NCDOT's needs. <br />