Browse
Search
Agenda - 11-14-2017 - D.1 - Zoning Atlas Amendment: Conditional Zoning —Master Plan Development
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2017
>
Agenda - 11-14-2017 - QPH
>
Agenda - 11-14-2017 - D.1 - Zoning Atlas Amendment: Conditional Zoning —Master Plan Development
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2017 2:50:16 PM
Creation date
11/14/2017 2:41:39 PM
Metadata
Fields
Template:
BOCC
Date
11/14/2017
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
D.1
Document Relationships
Minutes 11-14-2017
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2017
ORD-2017-023 Ordinance amending the Orange County Zoning Atlas - Settler's Point
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2010-2019\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br /> In consultation with the applicant and representatives of NC DOT, staff is recommending a <br /> condition be placed on the project requiring a full TIA be completed for all site plan <br /> application(s). This is to ensure required internal and/or external improvements to <br /> transportation systems are developed at the appropriate phase of development. <br /> Accommodation(s) for public transit stops will be made concurrent with the final site plan review <br /> process for each individual development proposal within the project. <br /> In discussing the project with Mr. Jason Shepard of the Orange County Emergency Services <br /> Department, he has requested a condition be placed on the project that final roadway layout, <br /> including widths and access points, be approved by the Fire Marshal's office as part of the final <br /> site plan review process. Planning staff concurs with the recommended condition. <br /> The applicant has agreed to the imposition of these recommended conditions. For more <br /> information please refer to Attachment 5. <br /> Utilities: The project is proposed to be served by public water and sewer systems provided by <br /> the Town of Hillsborough. <br /> Orange County is currently working with the Town to install a new sewer line under Interstate <br /> 40, which would serve District 1. This work is consistent with a recently approved inter-local <br /> utility agreement between Orange County and the Town of Hillsborough. Utility services for <br /> District 2 shall have to be reviewed and approved by the Town of Hillsborough prior to <br /> extension. <br /> STAFF COMMENT: Staff recommends the imposition of the following condition(s) associated <br /> with utility development: <br /> • Approval of the Setters Point MPD-CZ application does not constitute a guarantee utility <br /> services shall be provided and/or extended to serve the project. <br /> • Development(s) within the project shall be served only by public water and sewer <br /> services as provided and maintained by the Town of Hillsborough. <br /> • Utilities shall not be extended to serve District 2 until applicable inter-local utility <br /> agreement(s) are amended authorizing same. The applicant assumes responsibility for <br /> submitting a formal request to amend the aforementioned agreement(s) allowing for the <br /> extension of services. <br /> • Connection to public water and sewer shall comply with applicable Town of Hillsborough <br /> standards. The applicant assumes the responsibility for obtaining all authorizations <br /> allowing for same. <br /> • Extension of water/sewer lines within a District shall comply with applicable Town of <br /> Hillsborough standards. The applicant assumes the responsibility for obtaining all <br /> authorizations allowing for same. <br /> • Final location of fire hydrants shall be reviewed and approved by the Town of <br /> Hillsborough and the County Fire Marshal prior to the issuance of any permit authorizing <br /> land disturbing activities. <br /> • All site plan submittals shall include documentation indicating the Town has approved <br /> connection/extension of utility services for the proposed development. <br />
The URL can be used to link to this page
Your browser does not support the video tag.