Orange County NC Website
67 <br /> 17. 10.01 9872-29-8289 <br /> 18. 4.00 9872-28-6779 <br /> 19. 10.01 9872-18-7626 <br /> 20. 10.06 9872-09-8324 <br /> The above properties are currently zoned: <br /> • Economic Development Hillsborough Linear Office (EDH-2); <br /> • Economic Development Hillsborough Office/Retail (EDH-4); <br /> • Economic Development Hillsborough Research and Manufacturing (EDH-5); <br /> • Rural Residential (R-1) ; and <br /> • Special Flood Hazard Area (SFHA) Overlay District. <br /> The MPD-CZD request is broken out into the following 3 Districts that allow for distinct land <br /> uses: <br /> District 1: +/- 148 acres of Light Industrial Research <br /> District 2: +/-47 acres of Commercial/Retail/Service <br /> Distrcit3: +/-760 Senior Community and Single-family units <br /> II. NIM Meeting Overview: <br /> The meeting was attended by Orange County Current Planning Staff, the applicants, <br /> consultants, the real estate brokers and approximately 24 nearby residents. As specified in <br /> the UDO, the meeting afforded the applicant and area residents to review the project, the <br /> rezoning process and potential issues. <br /> A. Introduction <br /> Michael Harvey, Current Planning Supervisor with Orange County opened the meeting <br /> by reviewing the basic zoning requirements as outlined in the UDO, the rezoning and <br /> other required development processes, the site features and the major elements of the <br /> proposal. The applicants then reviewed the overall vision for the development as well <br /> as specific considerations for each of the districts and an illustrative rendering of the <br /> development. The meeting was then opened up to questions and answers with <br /> residents. <br /> B. Topics Discussed <br /> The topics of discussion included: <br /> 1. Traffic: On-site and off-site improvements, the applicant summarized the findings of <br /> the submitted Traffic Impact Analysis (TIA) including a breakdown of existing and <br /> planned signalization, walking connections between various Districts and the <br /> Waterstone Development within the Town of Hillsborough, phasing of existing and <br /> projected future levels of service (LOS) for immediate intersections. Comment(s) <br /> received from those in attendance included: <br /> a. Attendees indicated the TIA did not provide sufficient detail on the timeline <br /> for the installation of required improvements. <br /> DEVELOPER COMMENT: The Developer indicated the TIA is an <br /> overall guide identifying all required internal and external roadway <br /> improvements associated with the project. Each development <br />