Browse
Search
Agenda - 08-24-1992
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1992
>
Agenda - 08-24-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2017 4:46:20 PM
Creation date
11/8/2017 4:39:56 PM
Metadata
Fields
Template:
BOCC
Date
8/24/1992
Meeting Type
Public Hearing
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
21 <br />respectively - assuming public hearing on the Planned <br />Development on November 23, 1992. <br />4. If the project receives approval, final plats for each phase <br />must be recorded and all conditions of approval must be <br />complied with. Approvals at this stage are handled by the <br />County staff and attorney, and appropriate State and local <br />agencies. <br />C. APPLICATION „REQUIREMENTS <br />Application requirements for an amendment to the Comprehensive Plan <br />are contained in Articles 2 and 20 of the Zoning Ordinance. Listed <br />below are the requirements, followed by staff analysis of <br />information provided by the applicants (shown in bold). <br />Amendment Rationale <br />Article 2.2.14 states the reasons for which the Comprehensive <br />Plan may be amended: <br />a. "Because of changed or changing conditions in a <br />particular area of the County.” <br />The applicant cites the window of opportunity currently <br />open to allow a master- planned, neo- traditional <br />community on this site. Timing for land options (due to <br />expire at the end of 1992) that affect the feasibility of <br />the project are also cited. The applicant further cites <br />the Rural Character Study as a potential catalyst for <br />changing standards in this portion of the County. <br />The advent of cooperative planning between the Town of <br />Hillsborough and Orange County in this area is not cited <br />by the applicant, but this "changing condition" is very <br />relevant to the nature of land uses in the areas <br />surrounding Hillsborough. The site falls within the <br />Cooperative Planning Open Space Area, where the <br />introduction of water and sewer service for "large <br />developments...or small developments with significant <br />preserved open space" would be permitted. The <br />Cooperative Planning Agreement and forthcoming plans <br />represent a substantial changing condition in this area. <br />Finally, in previous applications, the applicant has <br />cited changing land use patterns from agricultural to <br />residential in the area as a changing condition. <br />b. "To correct an error or omission in the Comprehensive <br />Plan." No error or omission is cited by the applicants. <br />K3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.