Orange County NC Website
in <br />in- <br />Water and Sewer: <br />Meetings with public works officials of the Town of Hillsborough have made it <br />clear that water and sewer will be available from the town, and that adequate <br />capacity is in place. Satisfactory documentation will be provided to this effect. <br />�p Phasing: <br />It is projected that build -out will take 9 -10 years, with approximately 100 -1 0 <br />sales per year, depending upon market conditions, so the impact of University <br />Station on the local area will be gradual. <br />9 <br />As we near the end of the 20th Century, an increasing number of <br />families everywhere are dissatisfied with the current living conditions <br />they find in urban areas Street crime, traffic congestion and the de- <br />cay in the urban infrastructure cause them to look elsewhere for an <br />environment more suited to the needs of families of all sizes and ages. <br />More and more, people are turning back with a sense of nostalgia to <br />the values suggested by images of the 19th Century village, and to the <br />advantages of living in a small town environment: <br />University Station is planned to satisfy this desire for a simpler life in <br />a smaller place: a place where traffic is quiet, where families can walk <br />the streets or sit in the park, where children can play, where most of <br />the necessities can be found within a short walk In short, University <br />Station is planned for people, not for automobiles, and for the en- <br />7 <br />hancement of the quality of family life and the convenience and <br />gratification of a broad and diverse mix of families and individual <br />residents <br />