Orange County NC Website
16 <br />amounts of earthwork (cut and fill) that would contribute to increased <br />run -off of stormwater and siltation. <br />(Based on indicated topography there would not be signj cant amounts of <br />earthwork to construct a road to Stare standards. Also, the propern, is not <br />located in a watershed.) <br />EVALUATION SL71NMARY: The subdivision is not located in a protected watershed. The <br />subdivision road would be taken over by the State if it were built to their standards. It is <br />also located in a rural residential area at the intersection of Piney Grove Church Road and <br />US 70 Business, whicil is an arterial in the Comprehensive Plan' to the location, <br />proposed density and length of the road, Staff recommends the road be public and <br />constructed to State standards. <br />r_.l <br />