Browse
Search
Agenda - 08-18-1992
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1992
>
Agenda - 08-18-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2017 4:44:08 PM
Creation date
11/8/2017 4:36:39 PM
Metadata
Fields
Template:
BOCC
Date
8/18/1992
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12 .• <br />F. WATER TRANSMISSION AND <br />DISTRIBUTION LINES <br />F -1. South Columbia to manning Drive Phase II - Design of <br />approximately 5,000 feet of 24 -inch ductile iron water main <br />from the intersection of Cameron Avenue and Columbia Street to <br />the elevated storage tank near the hospital on Manning Drive. <br />The timing, scope, and route of this major project may be <br />modified by results of the distribution system analysis now <br />underway. <br />F -3. North Greensboro from Main Street in Carrboro to Estes Drive <br />Extension - Construction of approximately 3,000 feet of 12- <br />inch ductile iron water main will reinforce the distribution <br />system by paralleling the existing 6 -inch line. <br />F -6. Air ort Road from Stateside Drive to Rig sbee Mobile Home Park <br />- Construction of approximately 1,300 feet of 12 -inch ductile <br />iron main will reinforce the distribution system by providing <br />a service loop between existing lines in the 740 -fot pressure <br />district. Work to be coordinated with NCDOT wideninog of <br />Airport Road. <br />F -7. Estes Drive from East Franklin to 15 -501 ByRass - Construction <br />of approximately 3,100 feet of 16 -inch ductile iron main will <br />help optimize flows from the Manning Drive and Nunn Mountain <br />storage tanks to high demand service sectors. Associated <br />improvements will enable better control of excessive water <br />pressure at lower elevations in the distribution system. <br />F -10. U.S. 15 -501 South from Culbreth Road to Proposed Southern Tank <br />Site Near Star point -- Design and construction of approximately <br />12,000 feet of 12 -inch ductile iron transmission main to <br />provide improved fire flows and pressures in the southern <br />service area. In addition to serving the proposed storage <br />tank near Starpoint, this line will improve overall system <br />reliability by creating a major loop in the distribution <br />system. As with several other projects, timing and scope may <br />be modified per recommendations of the system analysis now <br />underway. <br />F -13. NC 54 East from Burning-Tree Drive to Laurel Hill Parkway - <br />Design and construction of approximately 4,600 feet of 12 -inch <br />ductile iron line will increase flows and pressure to areas <br />recently annexed by Chapel Hill and to projects underway near <br />the Friday Center. Additionally, this main will allow larger <br />water transfers between the OWASA and Durham systems during <br />periods of emergency need. <br />- 7 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.