Browse
Search
Agenda - 08-03-1992
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1992
>
Agenda - 08-03-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2017 4:43:32 PM
Creation date
11/8/2017 4:35:34 PM
Metadata
Fields
Template:
BOCC
Date
8/3/1992
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
425
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DaQQ4 <br />Burklin requested that the towns of Hillsborough <br />and Pittsboro be included in the plans for a <br />transit system noting that there are many who <br />work in RTP who reside in those two towns. <br />The response was that Chatham County is not <br />currently a member of the Triangle Transit <br />Authority. If Chatham County should become a <br />member, then, Pittsboro would be a likely town <br />for a transit system. Mr. Ritchey continued <br />noting that the area being discussed is in the <br />Jordan Lake Watershed and perhaps would not be an <br />area where intense development should be <br />considered. <br />Reid asked about the timeframe for construction, <br />if the study proved that such a project should <br />become a reality. Mr. Ritchey responded that he <br />was hopeful that construction would begin seven <br />to ten years from now and be in operation ten to <br />fifteen years from now. <br />Cantrell commented that commuter systems in <br />residential areas with which she was familiar <br />were very quiet operations. Mr. Ritchey's <br />response was that the transit system was a much <br />better neighbor than a sixteen lane highway. He <br />encouraged the Board to make the Commissioners <br />aware of their interest and opinions regarding a <br />transit system. <br />AGENDA ITEM #9: SUBDIVISION APPLICATIONS <br />a. Preliminary Plans <br />(1) Featherwood Phase II <br />Presentation by Eddie Kirk. <br />The property is located at the southeast corner <br />of Piney Grove Church Road (SR 1711) and US 70 <br />Business in Eno Township. The property is zoned <br />Rural Residential (R -1). The Land Use Element of <br />the Comprehensive Plan designates the area as <br />Rural Residential. <br />There are eight (8) <br />acres. The average <br />lots except lot 8 a <br />individual wells an <br />be used as a sewer <br />Part of lot 7 would <br />for lot 6. <br />lots-proposed out of 10.24 <br />lot si _ze is 1.29 acres. All <br />re proposed to be served by <br />d septic tanks. Lot,8 would <br />easement for lots 1 and 2. <br />be used as a sewer easement <br />A Class B private road, Featherwood Court, is <br />
The URL can be used to link to this page
Your browser does not support the video tag.