Browse
Search
Agenda - 08-03-1992
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1992
>
Agenda - 08-03-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2017 4:43:32 PM
Creation date
11/8/2017 4:35:34 PM
Metadata
Fields
Template:
BOCC
Date
8/3/1992
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
425
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTICLES 8.6 AND 8.8 - APPUCATION COMPONENTS Continued <br />PLANNING <br />BOARD EVIDENCE SUBMITTED <br />FINDINGS TO SUPPORT FINDINGS <br />Ordinance Requirements <br />• 7. Existing topography at a contour _x—Yes No <br />interval of five (5) feet based <br />on mean sea level datum <br />S. Proposed or existing fencing, _x—Yes No <br />screening, gates, parking, servicn <br />and storage areas <br />9. Access to site including sight Yes _x—No <br />distances on all roads used for <br />access <br />• 10. Elevations of all structures Yes _x—No <br />proposed to be used in the <br />development <br />11. Names and addresses of owners _x—Yes No <br />and applicants <br />• 12. A fee, as set by the Board of _x—Yes No <br />County Commissioners <br />• Finding affected by modification, PD -1 -92 <br />Topography is shown on the <br />second sheet with the schematic <br />site plan of the proposed <br />Resource Center. <br />Existing and proposed parking <br />and service, and storage areas <br />are indicated on the plan. <br />Sight distances are not shown <br />on the plan, but an on -site <br />inspection proved the sight <br />distance at the entrance on <br />Friends School Road is adequate. <br />Sections through the existing <br />Upper School and the proposed <br />Resource Center were submitted <br />showing building heights and <br />spacing. Elevations showing <br />building materials and window <br />spacing have not been prepared. <br />Provided with application. <br />$489.50 application fee paid <br />on 4/15/92. <br />A <br />BOARD OF <br />COMMISSIONERS <br />FINDINGS <br />Yes , No <br />Yes No <br />Yes No <br />Yes No <br />Yes No <br />Yes No <br />
The URL can be used to link to this page
Your browser does not support the video tag.