Orange County NC Website
C36) <br />EXHIBIT R -3 (CONTINUED) <br />2. other Major Development Costs <br />Existing conditions at a candidate site, the existing <br />infrastructure, and the need for special engineering designs <br />associated with to determine the extent of unique development <br />costs associated with the site. The impact is determined by <br />qualitative evaluation. Impact ratings are assigned values <br />between 1 and 5 based on a comparative analysis, with a <br />higher value reflecting a higher projected cost. <br />d. Land Use (within 1/2 mile of the site <br />P- edominant <br />Lan Use Ca acit <br />Rural <br />Transition <br />Community <br />Developed <br />Conservation <br />5 -22 -91 <br />Im act Ratin , B <br />3 <br />3 <br />3 <br />4, <br />