Orange County NC Website
June 1994 <br />July 1994 - March 1996 <br />April 1, 1996 <br />August 1996 <br />CONCLUSION <br />1 <br />V <br />Bid construction package <br />Construct building <br />Begin moving in to new building <br />Open school for students and <br />staff <br />The process described above provides for joint collaboration with the <br />degree varying on the type of decision to be made. It also clearly <br />establishes roles and responsibilities, recognizing that, form a practical <br />standpoint, the Chapel Hill- Carrboro City Schools must assume the major <br />responsibility for designing and constructing the new high school. The <br />process is intended, however, to be receptive to the concept of a merged <br />school district and provides opportunities to plan the high school such that <br />it will meet the needs of CHCCS in the short -run and of the entire county in <br />the long -run. <br />