Browse
Search
Agenda - 06-29-1992
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1992
>
Agenda - 06-29-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2017 4:52:01 PM
Creation date
11/8/2017 4:33:33 PM
Metadata
Fields
Template:
BOCC
Date
6/29/1992
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
817
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'r- <br />1 5. <br />DESIGN <br />The selection of architects and educational planners will be the <br />responsibility of the Chapel Hill - Carrboro City Schools. An educational <br />specification committee will be formed to provide direction to the architects <br />regarding the design of the facility. This committee will consist primarily <br />of CHCCS staff members with appropriate community representation. Meetings <br />will be open to OCS staff members to attend, listen to the discussions, and <br />provide the committee with their reactions; however, OCS representatives will <br />not be formal members of the committee. <br />ENROLLMENT <br />The superintendents will convene a committee to discuss program <br />collaboration between the two school districts once a new superintendent has <br />been appointed for the Chapel Hill- Carrboro City Schools. Discussions in <br />which the committee engages could extend beyond the programs which would be <br />offered at the new high school. At this time it might be best to leave <br />membership undefined because it could change depending upon the specific <br />program areas being discussed. The superintendents could agree at a later <br />date upon the appropriate membership with the understanding that both <br />districts would be equally represented. It is important, however, for this <br />committee to meet initially to determine the districts' receptivity to <br />allowing OCS students to enroll in the CHCCS district once the new high <br />school is constructed. Recommendations might need to be made by the <br />superintendents to their respective boards. <br />TIMETABLE <br />After reviewing the feasibility of opening a new high school in 1995- <br />96, the Non - Binding School Task Force concluded that the high school could <br />not open until August, 1996. The following timetable has been prepared: <br />1996 -97 OPENING <br />June 1992 - November 1992 Select architect <br />Convene Enrollment Committee <br />Convene Site Selection Committee <br />Convene Program Committee <br />March 1992 - November 1992 <br />August 1992 - December 1992 <br />December 1992 - August 1993 <br />September 1993 - May 1994 <br />April 1994 <br />Select site and acquire option <br />School Boards agree upon program <br />offerings at H.S. (e.g. compre- <br />hensive, magnet, scope of <br />voc.ed. program, etc.) <br />Convene Ed. Spec. Committee <br />Developed. specs. and schematic <br />drawings <br />Complete design and development <br />Bid site package <br />
The URL can be used to link to this page
Your browser does not support the video tag.