Browse
Search
Agenda - 06-01-1992
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1992
>
Agenda - 06-01-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2017 3:41:15 PM
Creation date
11/8/2017 3:33:20 PM
Metadata
Fields
Template:
BOCC
Date
6/1/1992
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' 13. UNC Indoor Tennis Facility: (under construction) - located <br />off the Laurel Hill Parkway, near the Friday Continuing <br />Education Center - 47,421 square feet of floor area. <br />14. Delta Sigma Phi Fraternity: (under construction) - 7,558 <br />square feet of floor area - located on Finley Golf Course Road <br />' at Prestwick Drive. <br />15. UniversitvVillage: (approved, not yet constructed) - mixed <br />use development with 12,600 square feet of office floor area <br />and 18,000 square feet of commercial floor area - located on <br />the south side of NC Hwy. 54 beside the University Inn. <br />� I <br />� I <br />� I <br />16. Glenwood Exxon: (approved, not yet constructed) - 1,104 <br />square feet of commercial floor area - located on the south <br />side of NC Hwy. 54 beside the Glenwood Square Shopping Center. <br />17. Pizza Hut Addition: (approved, not yet constructed) - located <br />off Estes Drive - 200 square foot addition to the restaurant <br />facility. <br />18. Public Library►: (approved, not yet constructed) - located off <br />Estes Drive behind the Siena Hotel - 27,450 square feet of <br />floor area with 118 parking spaces. <br />19. Howell Office Building.. Phase 2: (approved, not yet <br />constructed) - located on East Franklin Street near Couch Lane <br />- Phase 2 office building is 4,000 square feet, 2-- story. <br />20. Th Ballet School: (under construction) - located on East <br />Franklin Street across from Hillhaven Nursing Home - a 8,450 <br />square foot building with 19 parking spaces. <br />21. Delta, Delta Delta Sorority: (approved, new use for existing <br />structure) - 2,131 square feet of institutional floor area - <br />located on the south side of East Rosemary Street near <br />Hillsborough Street. <br />22. Lambda Chi Alrnha Fraternity, Renovations and New Construction: <br />(approved, not yet constructed) - located on East Franklin <br />Street across from the Planetarium -- with additions and <br />renovations, the fraternity will have 7,718 square feet of <br />floor area with 19 parking spaces. <br />23. Chanel of the Cross Addition: (approved, not yet constructed) <br />- located on East Franklin Street, beside Morehead Planetarium <br />- 2,091 square foot addition to the church. <br />24. UNC EPA Building: (approved, not yet constructed) - located <br />north of the Ambulatory Care Facility near Mason Farm Road - <br />145,746 square feet of floor area. <br />25. UNC Student Recreation Center: (under construction) - <br />Adjacent to Fetzer Gym at the corner of Stadium Drive and <br />
The URL can be used to link to this page
Your browser does not support the video tag.