Orange County NC Website
2 of 2 11 <br />o) It is not economically feasible to pave this road at this time. It was felt <br />that the 60' easement also would destroy un- necessary trees and take away the <br />ruail character of this size of subdivision. <br />p) AU lots will join in the.. roid and be maintained by a road covenant of w1dch <br />will own the property. <br />q) Under - ground utilities are to be installed. <br />r) There can never be more than the original single dwelling home -sites as listed <br />or served by this mad. <br />Sincerely., <br />Herman C. Davis, Sr. <br />