Browse
Search
Agenda - 05-26-1992
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1992
>
Agenda - 05-26-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2017 3:39:04 PM
Creation date
11/8/2017 3:32:21 PM
Metadata
Fields
Template:
BOCC
Date
5/26/1992
Meeting Type
Public Hearing
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
306
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 31 <br />STUDENT. GENERATION RATES AND IMPACT FEES <br />CHAPEL HILL- CARRBORO SCHOOL DISTRICT <br />BY HOUSING TYPE AND NUMBER OF BEDROOMS <br />Footnotes: (1) Assumes one high school and one middle school <br />built during CIP period, with $1.0 million per <br />school or total of $2.0 million funded from <br />impact fees. <br />(2) Assumes one high school, one middle school, and <br />one elementary school built during CIP period, <br />with $1.0 million per school or total of $3.0 <br />million funded from impact fees. <br />Page - 21.2 <br />Impact Fees <br />Student------------------------------------ <br />Generation <br />Maximum <br />Option #1 <br />Option #2 <br />Dwelling Type <br />Rates <br />(1) <br />(2) <br />Single--Family <br />_ 0.434„ <br />$3,194 <br />$768 <br />2 Bedroom <br />0.124 <br />$913 <br />_$512 <br />$146 <br />$219 <br />3 Bedroom <br />0.398 <br />$2,929 <br />$470 <br />$704 <br />4 Bedroom <br />0.870 <br />$6,403 <br />$1,026 <br />$1,540 <br />5 Bedroom <br />1.228 <br />$9,037 <br />$1,449 <br />$2,173 <br />Duo 1ex Tr i1p lex <br />0.218 <br />843 <br />258 <br />386 <br />and Quadplex <br />1 Bedroom <br />0.056 <br />$217 <br />$66 <br />$99 <br />2 Bedroom <br />0.139 <br />$538 <br />$165 <br />$246 <br />3 Bedroom <br />0.445 <br />$1,721 <br />$527 <br />$788 <br />Garden Apartment <br />0.146 <br />788 <br />204 <br />305 <br />1 Bedroom <br />0.027 <br />$146 <br />$38 <br />$56 <br />2 Bedroom <br />0.106 <br />$572 <br />$148 <br />$221 <br />3 Bedroom <br />0.480 <br />$2,591 <br />$671 <br />$1,003 <br />Townhouse <br />0.233 <br />---$1,597 <br />140 <br />210 <br />1 Bedroom <br />0.101 <br />$692 <br />$61 <br />$91 <br />2 Bedroom <br />0.110 <br />$754 <br />$66 <br />$99 <br />3 Bedroom <br />0.281 <br />$1,926 <br />$169 <br />$253 <br />Mobile Home <br />0.278. <br />$2,629 <br />__$350 <br />$525 <br />1 Bedroom <br />0.104 <br />$984 <br />$131 <br />$196 <br />2 Bedroom <br />0.115 <br />$1,088 <br />$145 <br />$217 <br />3 Bedroom <br />0.535 <br />$5,059 <br />$674 <br />$1,010 <br />Footnotes: (1) Assumes one high school and one middle school <br />built during CIP period, with $1.0 million per <br />school or total of $2.0 million funded from <br />impact fees. <br />(2) Assumes one high school, one middle school, and <br />one elementary school built during CIP period, <br />with $1.0 million per school or total of $3.0 <br />million funded from impact fees. <br />Page - 21.2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.