Orange County NC Website
TABLE 33 <br />STUDENT GENERATION RATES AND IMPACT FEES <br />ORANGE COUNTY SCHOOL DISTRICT <br />BY HOUSING TYPE AND NUMBER OF BEDROOMS <br />Impact Fees <br />Footnotes: (1) Assumes one middle school built during CIP <br />period, with $1.0 million funded from impact fees. <br />(2) Assumes one middle school and one elementary <br />school built during CIP period, with $1.0 million <br />per school or total of $2.0 million funded from <br />impact fees. <br />Page - 2 1 .4 <br />Student-------------------------------- <br />- - - -- <br />Generation <br />Maximum <br />Option #1 <br />Option #2 <br />Dwelling Type <br />Rates <br />(1) <br />(2) <br />Single-Family_ <br />0.497 <br />$2,747 <br />363 <br />726 <br />2 Bedroom <br />0.142 <br />$785 <br />$104 <br />$207 <br />3 Bedroom <br />0.456 <br />$2,520 <br />$333 <br />$666 <br />4 Bedroom <br />0.996 <br />$5,505 <br />$727 <br />$1,455 <br />5 Bedroom <br />1.406 <br />$7,771 <br />$1,027 <br />$2,054 <br />Duplex, Triplex, <br />0.,249 <br />$772 <br />$153 <br />_ 306 <br />and uad lex <br />1 Bedroom <br />0.064 <br />$198 <br />$39 <br />$79 <br />2 Bedroom <br />0.158 <br />$490 <br />$97 <br />$194 <br />3 Bedroom <br />0.509 <br />$1,578 <br />$313 <br />$626 <br />Garden Apartment <br />0.168 <br />$504 <br />_$147 <br />$294__ <br />1 Bedroom <br />0.031 <br />$93 <br />$27 <br />$54 <br />2 Bedroom <br />0.122 <br />$366 <br />$107 <br />$214 <br />3 Bedroom <br />0.552 <br />$1,656 <br />$483 <br />$966 <br />Townhouse <br />0.266 <br />$778 <br />$98 <br />197 <br />1 Bedroom <br />0.116 <br />$339 <br />$43 <br />$86 <br />2 Bedroom <br />0.126 <br />$369 <br />$46 <br />$93 <br />3 Bedroom <br />0.321 <br />$939 <br />$118 <br />$238 <br />Mobile Home <br />0.318 <br />$2,011 <br />$241 <br />$482_ <br />1 Bedroom <br />0.119 <br />$753 <br />$90 <br />$180 <br />2 Bedroom <br />0.132 <br />$835 <br />$100 <br />$200 <br />3 Bedroom <br />0.612 <br />$3,870 <br />$464 <br />$928 <br />Footnotes: (1) Assumes one middle school built during CIP <br />period, with $1.0 million funded from impact fees. <br />(2) Assumes one middle school and one elementary <br />school built during CIP period, with $1.0 million <br />per school or total of $2.0 million funded from <br />impact fees. <br />Page - 2 1 .4 <br />