Orange County NC Website
Mr_ Gayle Wilson <br />May 4, 1992 <br />Page two. <br />Table i - Responses to Access Requests for <br />Preliminary Geotechnical Investigations <br />Number of Responses <br />$1% Area <br />Site Total Area by Category <br />Appeved for <br />(acres) <br />Acoss (ecru) <br />Yes No No Response <br />OC -2 818 4 5 2' <br />OC -9 824 52 1 0 <br />T58 (61236) <br />OC -11 1643 5 11 <br />aC -17 853 9 1 2 <br />8$9 (8736) <br />Total Responses 23 18 9 <br />Notes: 1. The two properties are owned by the some person. <br />2. Includes one verbal response to Gayle Wilson (309 ), <br />3. Includes one letter that was not picked up at the post�4y <br />(O.T4 acm). <br />Given the above responses, we cannot process with the geoteehnigal Ihvlstloaftris as <br />planned. As such. Joyce Engineering is requesting assistance from V* LOG in obtNhing <br />access to properties where permission to enter the property was not "led, ploe" <br />contact us when a schedule is decided and /or if you have aryr queues regarding this <br />letter, <br />Sincerely. <br />JOYCE ENGINEERING, INC. <br />Mark A. TayIc1r. P.E. <br />Project Manager <br />cc: L.E. Joyce, Jr., P.E. <br />Bain. Palmer 8 Associates <br />I <br />7 <br />