Orange County NC Website
11 <br />TYPE IV <br />PUMP CONVENTIONAL WITH MULTIPLE PUMP <br />STATISTICS: <br />- APPROXIMATELY 10 IN ORANGE COUNTY <br />- ALL LESS THAN FIVE YEARS OLD <br />- NONE ARE CURRENTLY KNOWN TO BE FAILING <br />CURRENT PERMITTING PROCESS: <br />- DESIGNED BY OCHD OR PRIVATE ENGINEER <br />- DESIGN MAY REQUIRE REVIEW BY STATE DEH <br />- PERMITTED BY OCHD <br />- INSTALLATION INSPECTED BY OCHD <br />CURRENT MANAGEMENT PROCESS: <br />- ENGINEERED SYSTEMS MUST BE RE- INSPECTED ONCE EACH YEAR <br />PRPOSED MANAGEMENT PROCESS: <br />- OCHD WOULD INSPECT SYSTEMS TWO TIMES PER YEAR <br />- OCHD WOULD SERVE AS MANAGEMENT ENTITY FOR THESE SYSTEMS <br />RATIONALE: <br />- ANY SYSTEMS WITH MULTIPLE PUMPS SHOULD BE CHECKED TWICE <br />YEARLY TO INSURE PROPER AND SAFE OPERATION <br />-.THESE SYSTEMS REQUIRE COMPLEX ELECTRICAL PANELS WHICH ALSO <br />MUST BE CHECKED AND MONITORED <br />STATE MANAGEMENT ENTITY REQUIREMENTS: <br />- SYSTEMS MUST BE INSPECTED BY PME OR PRIVATE CERTIFIED <br />STATE REVIEW REQUIREMENTS FOR OCHD: <br />- ONCE PER THREE YEARS FOR NON - ENGINEERED SYSTEMS <br />- ONCE PER YEAR FOR ENGINEERED SYSTEMS <br />OCHD PROPOSAL CLASSIFICATION: CLASSES II AND IV <br />STATE REGULATION CLASSIFICATION: TYPE IV <br />