Orange County NC Website
M <br />and /or policy proposals before decisions are made by advisory <br />boards and the Board of Commissioners. It is incumbent upon each <br />department to advise its respective advisory board of proposals and <br />solicit comments as necessary. Although the majority of such <br />proposals flow from the Planning Department to the Economic <br />Development Department, proposed changes to the Economic <br />Development Strategic Plan are subject to Planning Staff and <br />Planning Board review. Both aspects of cooperative planning have <br />been effective since July 1, 1991. <br />Target Area Analysis. As indicated previously, the PB /EDC Work <br />Group selected three areas in the interstate corridors to study as <br />potential economic development areas. The first area studied was a <br />246 -acre site in the northeast quadrant of the I- 85 /Buckhorn Road <br />interchange (see Attachment 1). Using construction cost data from <br />an area contractor and a spreadsheet template, the Economic <br />Development Staff projected the economic feasibility of a 100 -acre <br />business park in the quadrant (see Attachment 2). The template <br />enabled the PB /EDC Work Group to identify a development scenario <br />for the site which included the following distribution of land <br />uses: <br />Distribution 55% <br />Manufacturing 20% <br />Flex Space 20, <br />Service 5% <br />Concurrent with the preparation of an economically viable <br />development scenario, the Planning Staff identified development <br />constraints within the entire 246 -acre quadrant. A conceptual site <br />plan was then prepared, illustrating how the tract could be <br />developed to achieve the desired distribution of uses. The Planning <br />Staff also considered the inclusion of two potential uses which has <br />expressed interest in locating in the area. <br />The second location to be considered by the PB /EDC Work Group <br />involved all four quadrants of the I -40 /Old N.C. 86 interchange <br />(see Attachment 3). Following the preparation of a development <br />constraints map for the area. the Economic Development Staff <br />projected the economic feasibility of a 1000 -acre business park, <br />built in three phases, for the area (see Attachment 10). The <br />resulting development scenario for the site included the following <br />distribution of land uses: <br />Distribution 102% <br />Manufacturing 25% <br />Flex Space 30% <br />Office Space 20% <br />Retail /Service 12% <br />Public 3% <br />The principal reason for delaying completion of the target <br />area analysis, including the area around the I- 85 /U.S. 70 <br />interchange (see Attachment 4), stemmed from discussions of the <br />appropriate distribution of land.uses and the performance standards <br />