Browse
Search
Agenda - 04-21-1992
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1992
>
Agenda - 04-21-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2017 3:29:48 PM
Creation date
11/8/2017 3:21:15 PM
Metadata
Fields
Template:
BOCC
Date
4/21/1992
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
364
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cheeks Elementary School as well as within certain existing residential <br />areas, and (ii) the.County will be improving the Town's existing wastewater <br />collection system by constructing a gravity line within the Town; and (iii) <br />construction of the County system will alleviate a source of pollution <br />(from failed septic tanks) of the Eno River, the Town's water supply <br />source; <br />NOW, THEREFORE, in consideration of the foregoing and the mutual <br />agreements hereinafter set forth, it is agreed as follows: <br />1. The Town agrees to allow the County, at County expense, to tie its <br />wastewater collection system to the interceptor at Dimmocks Mill Road <br />(State Road 1144) as set forth in the Engineer's Revised Plans and <br />Specifications. Such connection shall be made in strict accordance with <br />plans and specifications approved in advance in writing by the Town in <br />order to ensure its compatibility with the Town's wastewater collection and <br />treatment facilities and policies. <br />2. The County agrees to pay the Town $15,000.00 as a blanket availa- <br />bility (tap) fee for the privilege of connecting the Efland- Cheeks <br />Elementary School wastewater facility and the County's initial 212 custo- <br />mers to the Town's sytem. The customer list and map will be provided to <br />the Town. Five thousand dollars of the $15,000 is for the availability <br />associated with the Efland - Cheeks Elementary School. The above $15,000 <br />availability fee shall be paid before any wastewater is permitted to flow <br />through the meter. <br />3. The Town agrees to treat up to 380,000 gallons of the County <br />system's wastewater per .day, which includes the wastewater generated by <br />said school and the initial 212 customers of the County's wastewater <br />
The URL can be used to link to this page
Your browser does not support the video tag.