Orange County NC Website
L 'd <br />9008296616 WOU a <br />Z <br />Me* Lots T. Herring <br />Marsh Or 1992 <br />operational within 10 years. Thus the desired length of mid -term <br />supply agreement is ten years. Our draft feasibility study <br />indioates a peak day demand of 1.2 mgd by the year 2000. Extra- <br />polating the growth until 7003 provides a peak day demand of 1.35 <br />mgd. Taking into account an existing supply of 0.65 mgd and a <br />continued decline in well production, a proposed supply supple_ <br />Mont is as follows: <br />M nimum Daily GPD <br />Maximum DailX GPD <br />1993 <br />1994 <br />25,000 <br />300,000 <br />1995 <br />25,000 <br />50,000 <br />300,400 <br />1994 <br />1997 <br />500000 <br />300,000 <br />30Q,OQ0 <br />1999 <br />50,000 <br />50,000 <br />440,000 <br />1999 <br />2000 <br />50,000 <br />400,040 <br />SOO,OQQ <br />2041 <br />750000 <br />75,000 <br />SpQ,OQO <br />2002 <br />75,00* <br />600,000 <br />6000400 <br />A minimum daily demand is recommended in order to provide OWASA a <br />base Source of revenue and to insure a constant ttq�uurnover of water <br />in the interconnection line. The fact that Chatham County will <br />have a 1.1 million gallon storage tank at an elevation that water <br />can be forwarded back to OWASA during an emergency may be of <br />interest to you. <br />The proposed interconnection location would be near the <br />Orahge /Chatham county line at 13 -501. Chatham County would <br />extend a 12" line from the existing system to this location. <br />I would appreciate an opportunity for our staff to make a presen- <br />tation to the OWASA Board and the elected boards for Orange <br />County, Chapel Hilt and Carrboro. We want to be sure that you <br />understand fully the nature of our problem. <br />Pleas* let me <br />Information. <br />Sin *rely, <br />'t "l <br />m <br />Chaixti on a rd <br />know if you have questions or desire further <br />Of Commissioners <br />