Orange County NC Website
4 <br />Most Site Plans must be certified by a registered engineer, <br />landscape architect, architect, or land surveyor. Certification <br />is not required for additions, alterations, or accessory <br />buildings which meet certain criteria (specified in Article <br />14.2.1) It is suggested that a fee of $117.00 be considered for <br />those site plans which do require certification. The amount of <br />time involved in this review process would be comparable to Major <br />Transportation Corridor (MTC) Site Plan Review, for which a fee <br />of $117.00 is charged. <br />It is suggested that a fee of $60.00 be considered for those site <br />plans which do not require certification. Less review time would <br />be needed because the projects which would qualify would be more <br />simple. The amount of time involved in this review process would <br />be similar to that of the Minor Subdivision Concept Plan, for <br />which is fee of $60.00 is charged. <br />The number of anticipated site plan reviews is a total of 12 per <br />year, 60% (7) which would require certification and 40% (5) which <br />would not. Thus, resulting in a total revenue of $1119, $819 and <br />$300, respectively. These figures may increase when the economy <br />improves. <br />It is further proposed that fees not be charged for review of <br />site plans for single - family detached dwellings, duplexes, and <br />accessory structures within the University Lake watershed. <br />EXISTING PROVISIONS: <br />No fees for Preliminary Plat Re-- approvals or Site Plans. <br />PROPOSED AMENDMENT: <br />Re- Approval of Expired Preliminary Plat <br />Non - Residential Site Plan Review <br />(Certification required) <br />Non -- Residential Site Plan Review <br />(No Certification required) <br />*** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** <br />ORDINANCE REVIEW SUBCOMMITTEE: 7/9/91 <br />PLANNING BOARD REVIEW: 9/16/91 <br />BOCC REVIEW: <br />$60.00 <br />$117.00 <br />$60.00 <br />J <br />