Browse
Search
Agenda - 03-24-1992
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1992
>
Agenda - 03-24-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2017 3:21:39 PM
Creation date
11/8/2017 3:15:40 PM
Metadata
Fields
Template:
BOCC
Date
3/24/1992
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
306
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11.5.3 The rates and multiples set forth for Additional Services shall be annually adjusted in accordance with normal salary review <br />practices of the Architect. <br />ARTICLE 12 <br />OTHER CONDITIONS OR SERVICES <br />(insert descriptions of otber services, identify Addition! ,Services include a umiann Basic Compensation and modifications to the payment and compensation terms <br />included in ibis Agreement.) <br />12.1 Reference subparagraph 2.1.1 - The Architect's Basic Services consist of those <br />described in paragraphs 2.2 through 2.6 and any other services identified in <br />Article 12 as part of Basic Services and include the services of Professional <br />Structural, Mechanical, Civil and Electrical Engineers, qualified by training and <br />experience in their respective fields as needed to address the requirements of the <br />project as defined herein; and shall require such professional engineers to place <br />their seal, name and signature on the drawings and specifications prepared by <br />them. <br />12.2 Reference subparagraph 2.2.1 and 3.4.1 - The Architect shall furnish a program <br />to the Owner, as part of Basic Services, to ascertain the requirements of the <br />Project and shall arrive at a mutual understanding of such requirements with the <br />Owner, and shall submit such understanding in writing, and shall furnish a copy <br />to the Owner for its approval before proceeding with schematic design. <br />12.3 Reference subparagraph 2.4.2 - The Architect, after consultation with Owner, <br />shall prepare the necessary bidding information and bid forms to comply with <br />public building laws as set forth in North Carolina General Statues Chapter 143, <br />including the necessary information required by Chapter 87 of the North Carolina <br />General Statues pertaining to the licensing of contractors, and shall assist the <br />Owner in preparation of the conditions of the contract and the form of the <br />agreement between the Owner and Prime Contractors. <br />12.4 Reference subparagraph 2.4.4 - The Architect shall prepare, file with the <br />appropriate regulatory agency (agencies) and, if requested, present information to <br />the governing body (bodies) with jurisdiction over the Project. <br />Article 12 continued on Page No. 11 <br />This Agreement entered into as of the day and year first written above. <br />OWNER COUNTY OF ORANGE <br />fh <br />(Sig re)l <br />if z 1 r / f <br />(Prt'nted name and title) <br />ARCHITECT GRI <br />(Signature) <br />S, P.A. <br />W. <br />E' GI L <br />(Printed name and tt le <br />AIA DOCUMENT B141 • OWNER - ARCHITECT AGREEMENT • FOURTEENTH EDITION • AIA® • 01987 <br />THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASHINGTON, D.C. 20W6 8141 -1987 .10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.