Developer James L Anthony, Jr_ TOWN OF HILLSBOROUGH <br />Project Corne SEWER EXTENSION CONTRACT <br />APPENDIX A <br />Developer, the Town and County agree to satisfy the following <br />conditions in addition to those set forth in the SEWER EXTENSION <br />CONTRACT before the Town will permit the connection of improvements <br />constructed for the above - referenced project to the Town sewer <br />system: <br />1. Developer shall construct and install or cause to have <br />constructed and installed at Developer's sole expense the <br />referenced sewer extension project. <br />2. The County agrees to pay to the Developer the amount of <br />$78,000 toward the cost of that segment of the 18" gravity sewer <br />line to be constructed by Developer pursuant to this contract which <br />extends from the Elizabeth Brady pump station under and to the <br />South side of US Highway 70A. This segment of the extension will <br />benefit a proposed industrial development in the County. <br />3. The Town agrees to pay to the Developer the amount of <br />$75,000 toward the cost of constructing that segment of the 18" <br />sewer line to be constructed by the Developer pursuant to this <br />contract which extends from the Elizabeth Brady pump station under <br />and to the South side of US Highway 70A. The Town's contribution <br />represents approximately the difference between the cost of the 16" <br />line that the Town requires to serve properties other than the <br />project property and the cost of an 8" line that would be the <br />minimum size required by the Town to serve the project property <br />only. <br />4. The Town agrees to pay the Developer the amount of <br />$20,000 toward the cost of constructing that segment of the 18" <br />sewer line to be constructed by the Developer pursuant to this <br />contract which extends from the south side of US Highway 70A to the <br />project property. The Town's contribution represents approximately <br />the difference between the cost of the 18" line that the Town <br />requires to serve properties other than the project property and <br />the cost of an 8" line that would be the minimum size required by <br />the Town to serve the project property only. <br />5. By means of a separate agreement between DCA General and <br />Meadowlands Associates, Meadowlands Associates or its successors <br />or assigns agrees to pay to Developer the amount of $30,000 toward <br />the cost of the Project, representing the approximate savings <br />realized by not having to construct a redundant and unnecessary <br />sewer line. As a matter of public record only, Meadowlands has <br />further agreed not to make connection to the line until such <br />payment is made with interest. Notwithstanding the foregoing, the <br />Town will allow Meadowlands to connect to its system upon the <br />payment of fees in accordance with the. Town's ordinances and <br />