Browse
Search
Agenda - 01-21-1992
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1992
>
Agenda - 01-21-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2017 3:12:20 PM
Creation date
11/8/2017 3:07:07 PM
Metadata
Fields
Template:
BOCC
Date
1/21/1992
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 10 of 15 <br />Section 13. Useful Life of Project Equipment. "Useful life" for all <br />Project equipment shall be determined by the Department. Upon the end of <br />the period of useful life, the Contractor may dispose of Project equipment <br />after notifying and receiving disposition instruction from the Department. <br />Section 14. Disposition of Project Equipment. The Contractor shall <br />dispose of all project equipment in accordance with General Statutes <br />143 -64.1 through 143 --64.5 and the provisions of OMB Circular A -102, dated <br />January 1981. <br />(a) Disposition of Equi nt at the End of Useful Life. Fair market <br />value shall be deemed to be the value of the property as determined by at <br />least two (2) competent appraisals at the time of disposition. Loss of value <br />as a result of negligence, maintenance practices of the Contractor, or other <br />causes outside of normal use are the responsibility of the Contractor and <br />may, at the discretion of the Department, be added to the fair market value. <br />(b) <br />Loss <br />of Project Equipment Due to <br />Casualty <br />or Fire. <br />Fair market <br />connection with the <br />execution of <br />value shall <br />be <br />deemed to be equal to the <br />damages <br />paid by the <br />Contractor's <br />insurance carrier or from the self - insured reserve account. In no event <br />shall salvage value be considered as fair market value for project equipment. <br />Section 15. Interest of Members of or Delegates to Congress. No <br />member of or delegate to the Congress of the United States shall be admitted <br />to any share or part of this Agreement or to any benefit arising therefrom. <br />Section 16. Prohibited Interest. No member, officer, or employee of <br />the Department or of the Contractor shall have any interest, direct or <br />indirect, in this Agreement or the proceeds therefrom. <br />Section <br />17. <br />Equal Employment <br />Opportunity. <br />In <br />connection with the <br />execution of <br />this <br />Agreement, <br />the <br />Contractor shall <br />not <br />discriminate against <br />any employee or applicant for employment because of race, color, sex, or <br />
The URL can be used to link to this page
Your browser does not support the video tag.