Browse
Search
Agenda - 01-21-1992
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1992
>
Agenda - 01-21-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2017 3:12:20 PM
Creation date
11/8/2017 3:07:07 PM
Metadata
Fields
Template:
BOCC
Date
1/21/1992
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 9 of 15 <br />with the primary purpose of service provisions. The aforemented documents, <br />and any subsequent amendments or revisions, thereto, are herewith <br />incorporated by reference. If any Project equipment is not used in <br />accordance with this Section or is withdrawn from the transportation <br />service, whether by planned withdrawal or casualty loss, the Contractor <br />shall immediately contact the Department. If the Department determines that <br />Project equipment is not being fully utilized, the Contractor shall transfer <br />or dispose of the Project equipment at the direction of the Department. <br />Failure to carry out the requirements set forth in this Section shall <br />constitute a breach of contract and, after notification by the Department, <br />may result in termination of the Agreement. <br />Section 11. Maintenance and Inspection. The Contractor shall maintain <br />all project equipment at a high level of cleanliness, safety, and mechanical <br />soundness. The Department shall conduct inspections, not less than once <br />every two (2) years, to confirm proper maintenance pursuant to this Section <br />and use compliance in accordance with Section 11 of this Agreement. The <br />Contractor shall maintain all records of maintenance deemed necessary and <br />appropriate by the Department until disposition of Project equipment. <br />Section 12. Insurance. The Contractor shall be responsible for <br />protecting the federal and state financial interests in project equipment <br />purchased under this Agreement throughout the useful life of the equipment. <br />The Contractor shall provide, on an annual basis and in such manner as the <br />Department may require, written documentation that all equipment is insured <br />against loss in an amount equal to or greater than eighty -five (85x) percent <br />of the real value of the equipment. Failure of the Contractor to provide <br />adequate insurance shall be considered a breach of contract and, after <br />notification by the Department, may result in termination of this Agreement. <br />
The URL can be used to link to this page
Your browser does not support the video tag.