Orange County NC Website
61, <br />Manville Application of <br />Roof Insulation <br />0.1 General <br />This specification is for use over approved lightweight insulating <br />fills which can receive and adequately retain nails or other <br />types of mechanical fasteners as may be recommended by the <br />fill manufacturer. <br />A list of approved fills is available from the Manville District <br />Technical Services Department. <br />Note: All information contained in the current Manville Industrial/ <br />Commercial Roofing Systems Manual shall be considered part <br />of this specification. <br />0.2 Materials per 100 sq. ft. of roof area over lightweight <br />aggregate concrete: <br />Felts: <br />As nailable base— GlasBase'" <br />or Ventsulationa ..................................... ............................... 1 layer <br />As vapor retarder— GlasPlys Premier <br />p <br />or GlasPl yP IV ....................................... ............................... 1 layer <br />Bitumen <br />Per Felt Per Insulation <br />Incline Type Ply (lbs.) Layer (lbs.) <br />Up to 1" 170 deg Type II* 23 23 -33 <br />1" to W 190dtglipeill 23 23 -33 <br />Insulation: <br />Fesco @pard, Fes -Core® UltraGard Gold' ", <br />Tad WitraGard-Gold TM <br />pere , <br />or Fesco Foams ............................ <br />.................. 100 sq. ft. per layer <br />"Consult the Manville District Technical Services DepartrneM regarding projects in hot climates. <br />0.3 Application <br />Base Felt: Apply one layer of Ventsulation or GlasBase starting <br />at the low edge and lapping each course 2" over the preceding <br />one. Nail the laps at 9" centers and down the longitudinal <br />center of each felt nail two rows of nails with the rows spaced <br />approximately 11 "apart and nails staggered on approximately <br />18" centers. Use nails or fasteners appropriate to the type <br />of deck. <br />Vapor Retarder (if required): Apply one 18" wide layer of <br />GlasPly Premier or GlasPly IV, then continue with full 36" <br />widths, lapping each course 2" over the preceding one. Install <br />each felt so it shall be firmly and uniformly set, without voids, <br />into the hot (within 25 °F of the EVT) asphalt applied just before <br />the felt at a nominal uniform rate of 23 lbs. per square over the <br />entire surface. All edges of the felts shall be turned up on, but <br />not connected to, all vertical surfaces and extend beyond all <br />roof edges. This coverage must be great enough to permit at <br />least a 4" return over the top surface of the insulation. <br />20 <br />Specification No. 502 <br />For use over Lightweight Insulating <br />Fills Employing Fesco® Fes -Core@ <br />Fesco Foam@ or UltraGard Gold TM on Inclines <br />up to 6" per Foot --With or Without a <br />Vapor Retarder <br />For Regions 1t, 2 & 3 <br />Na <br />Ins <br />m <br />Nailers (if required): Nailers, the same thickness as the <br />insulation, are tD be installed in keeping with the requirements <br />of the selected membrane specification. Wood nailing strips, <br />edging and curbs should have been treated with preservatives <br />which will not react with asphalt. Oil based preservatives such <br />as creosote are not acceptable. See Section 11 of the Manville <br />Industrial /Commercial Roofing Systems Manual for specific <br />placement of nailing strips and orientation of roof assembly <br />materials. <br />Insulation: Firmly set the units of insulation, long joints continuous <br />and short joints staggered, into a full width mopping of hot <br />(within 25 °F of the EVT) asphalt applied at an approximate rate <br />of 33 lbs. per square if applying high thermal insulation (Fes -Core, <br />UltraGard Gold, Tapered UltraGard Gold or Fesco Foam) to a <br />low thermal insulation (Fesco Board) in a two layer operation. <br />If applying insulation to either a base felt or vapor retarder, use <br />a rate of 23 lbs. per square. <br />When applying a second layer of insulation, have both the long <br />and short joints offset from the joints in the first layer. <br />Before application of the roofing, the projecting felt at all vertical <br />surfaces and edges shall be turned over and solidly mopped to <br />the insulation. The insulation shall not be left exposed to the <br />weather. No more insulation shall be applied than can be <br />completely covered with the finished membrane on the same day.. . <br />tContacl the M WI@ District Technical Services DeparGnen( for written approval in using this <br />spedltcallm over ete ON selecled. <br />1�) <br />