Browse
Search
Agenda - 01-06-1992
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1992
>
Agenda - 01-06-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2017 2:42:17 PM
Creation date
11/8/2017 2:37:06 PM
Metadata
Fields
Template:
BOCC
Date
1/6/1992
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
22 <br />MEMORANDUM <br />TO: Eddie Kirk, Planner II <br />FROM: Paul Thames. County Engineer <br />DATE: November 8. 1991 <br />SUBJECT: �Stonegate Mobile Home Park <br />As per your request, I have reviewed the site plans for the <br />above referenced -project, particularly with regard to the <br />layout of the waste treatment system. <br />There are several aspects about this project that trouble me. <br />While I have not seen or reviewed any design or engineering <br />information on the spray irrigation treatment system for this <br />project, I have faith in DEM's permitting design review <br />Procedure, in the treatment quality provided by spray <br />irrigation systems in general and in the treatment quality <br />provided by spray systems with pretreatment by package waste <br />treatment systems in particular. However, DEM has permitted <br />this particular system with relaxed.buffer and setback <br />requirements. This is apparently because the applicant owns <br />all of the properties,,except the railroad right -of -way, <br />surrounding the property parcel on which. the spray system is <br />located. Generally. the wetted areas of spray irrigation <br />fields are required to be buffered 150 feet to property <br />lines. one hundred feet to right -of -ways, four hundred feet <br />to occupied dwellings not served by the sewer system in <br />question, 200 feet to occupied dwellings served by the <br />treatment system in question and 100 feet to water supply <br />wells. In addition. waste treatment units such as lagoons <br />are required to be at least fifty feet from property lines. <br />In the case of Stonegate's spray fields; the wetted areas <br />appear to come to within twenty -five feet o.f property lines <br />and the lagoon appears to come within ten feet of property <br />..lines. I would recommend that the Planning Department make <br />some sort of.requirement of the owner that.waste treatment <br />easements and building setbacks be platted, deeded and <br />recorded for all property parcels surrounding the parcel <br />containing the proposed spray irrigation fields and the <br />lagoon. If surrounding properties are sold while the spray <br />system remains in operation and setbacks are not recorded, <br />the new owners could inadvertently build or plan unsuitable <br />activities within areas which should be reserved for waste <br />treatment setbacks. <br />
The URL can be used to link to this page
Your browser does not support the video tag.