Orange County NC Website
05 <br />platted to meet N.C. DEM setback requirements. <br />These easements shall act as setbacks and buffers <br />to ensure continued compliance with N.C. DEM <br />standards. <br />4. In order to ensure compliance with the 25,000 gpd <br />(gallons per day) capacity of N.C. DEM permit <br />number WQ0004370 issued to Ms. Dorothy C. Bane, <br />Stonegate Mobile Home Park Wastewater Treatment <br />and Spray Irrigation System, Orange County, on May <br />31, 1991, the number of units permitted in the <br />park shall not exceed 104 with a total number of <br />bedrooms not to exceed 208. It is the intent of <br />this provision to limit the number of units in the <br />park to 104 or less to ensure that the total <br />number of bedrooms shall not exceed 208 in <br />combination whether contained in 1, 2, or 3 <br />bedroom units. <br />5. A final boundary survey, including all easements, <br />of the amended Planned Development and <br />improvements shall be recorded by the developer. <br />No decision on the application is made by either the <br />Planning Board or Board of Commissioners at the public <br />hearing. Instead, the Planning Board has 60 days within <br />which to prepare and submit a recommendation to the <br />Board of Commissioners. Failure of the Planning Board <br />to submit a recommendation within the required time <br />shall be considered a favorable recommendation, without <br />conditions. <br />Administration Recommendation <br />The Administration recommends that the application be <br />referred to the Planning Board for a recommendation to <br />be returned to the Board of Commissioners no sooner than <br />January 6, 1992 and no later than February 3, 1992. <br />