Browse
Search
Agenda - 11-25-1991
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1991
>
Agenda - 11-25-1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2017 12:11:55 PM
Creation date
11/8/2017 12:03:27 PM
Metadata
Fields
Template:
BOCC
Date
11/25/1991
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
352
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dorothy C. Bane, Stonegate Mobile Home <br />Park Wastewater Treatment and Spray <br />Irrigation System, Orange County on May <br />31, 1991; Credle Engineering receives <br />Norfolk Southern Corporation Application <br />with list of documentation needed for <br />proposed easement and spur line crossing <br />of sewer lines in connection with <br />wastewater treatment and spray <br />irrigation system; Mrs. Bane contracts <br />with Alamance Pump Company and purchases <br />pumps for the wells; obtains a pump down <br />test to redetermine adequate volume; and <br />secures chemical analysis and other <br />tests to determine adequate fresh water <br />supply which are approved by DEM; E. <br />Villanova and C. Bane successfully <br />complete examination and qualify as <br />Grade I Certified Wastewater Treatment <br />Operators; Wilson Engineering Soil <br />Boring analysis completed; received <br />Carolina Crane estimate to move Sewer <br />Treatment Plants; Credle Engineering <br />advises Orange County Planning <br />Department in response to three 1990 and <br />1991 letters inquiring in regards to <br />changes in the Site Plans that no change <br />had resulted only that wastewater <br />disposal changed from Rhodes Creek <br />discharge to spray irrigation system; <br />Orange County Planning further advised <br />that when DEN approval had been received <br />for the wastewater treatment and spray <br />irrigation system it would be forwarded; <br />Orange County Planning makes further <br />inquiries to which Credle Engineering <br />responds. <br />July - November, - Credle Engineering makes several <br />1991 responses to Orange County Planning <br />inquiries; orange County Planning raises <br />issue as to whether change from Rhodes <br />Creek discharge to spray irrigation <br />system is a minor change or a <br />modification; Haywood, Denny, Miller, <br />Johnson, Sessoms and Patrick, Attorneys, <br />begin discussion with Orange County <br />Planning in order to seek modification <br />of Special Use Permit under Section 8.7 <br />of the Orange County Zoning Ordinance; <br />Application for Modification prepared <br />for filing; information accumulated to <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.