Browse
Search
Agenda - 11-25-1991
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1991
>
Agenda - 11-25-1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2017 12:11:55 PM
Creation date
11/8/2017 12:03:27 PM
Metadata
Fields
Template:
BOCC
Date
11/25/1991
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
352
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1990 <br />1991 <br />discharge into Rhodes Creek; Soil <br />Scientist with orange County Health <br />Department employed and paid for <br />completed soil evaluation; Duke Power <br />electrical service to park completed; <br />contractor contacted for boring under <br />Southern Railway Mail Line; Soil Erosion <br />Plan submitted and approved; GTE South <br />contacted for telephone service; NCDOT <br />approves driveway permit. <br />January - June, <br />- S. V. Credle investigates various <br />1990 <br />alternatives suggested by DEM in <br />conjunction with Orange County Health <br />Department for on -site subsurface <br />absorption system, low pressure <br />injection system and spray irrigation <br />system; spray irrigation system appears <br />the most feasible and S. V. Credle <br />begins process to deal with DEM to <br />develop wastewater collection, treatment <br />and spray irrigation system for on -site <br />disposal of wastewater; several sites <br />for the location of the system <br />considered with the Health Department <br />and DEM to identify acceptable site for <br />spray irrigation system; soil erosion <br />devices begun and completed; wells sites <br />approved by DEM; GTE South telephone <br />service to park completed. <br />July - December, <br />- After extensive work with Health <br />1990 <br />Department and DEM, acceptable site is <br />located and Credle Engineering completes <br />plans and makes application to DEM for <br />approval of spray irrigation system; <br />Credle Engineering begins inquiry and <br />negotiation with Norfolk Southern <br />Corporation to obtain further easement <br />in edge of railroad right -of -way for <br />proposed force main, sewage overflow <br />line and underground pipeline crossing <br />Norfolk Southern Corporation's spur <br />tract. <br />January - June, <br />- Extensive design and redesign of spray <br />1991 <br />irrigation system by Credle Engineering <br />in consulting with DEM resulting in <br />issuance of Permit No. WQ0004370 to Mrs. <br />01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.