Orange County NC Website
3 <br />911 CHANGE ORDER SYNOPSIS <br />8. Re- terminate the water line The purpose of this request is two -fold. First, the line was better <br />out the back of the building and suited to terminate in the rear of the building Were there was <br />install extra interior water no passibility to cut telephone cables rather than to extend <br />holding tanks. $1629 across the driveway and around to the front of the building as <br />originally designed. Second, the well at the 911 facility pumps <br />4 gal per minute. The additional bladder tanks will provide a stable <br />water source during times of heavy water usage, such as when the EX is <br />in full use or when large training classes are ongoing. <br />TOTAL CHANGE ORDER REQUEST $6318 <br />