Browse
Search
Agenda - 10-07-1991
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1991
>
Agenda - 10-07-1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2017 11:52:30 AM
Creation date
11/8/2017 11:39:55 AM
Metadata
Fields
Template:
BOCC
Date
10/7/1991
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
544
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 <br />. TABLE 1 <br />CONSTRUCTION COST ESTIMATES FOR EFLAND SEVER EXTENSION <br />NOTE: All Phase designations refer to Phasing Map entitled "West <br />Orange Sanitary Sewer" by Hazen and Sawyer <br />PHASE I <br />Relocate Pump Station <br />$ 35,000 <br />(Remainder) <br />New Pump Station <br />33,000 <br />1900 LF -12" Gravity <br />91,200 <br />13275 LF - 8" Gravity <br />424,800 <br />2000 LF - 10" Force Main <br />50,000 <br />2200 LF- 4" Force Main <br />26,400 <br />Contingency, <br />Engineering, Legal, Admin., Survey <br />182,600 <br />TOTAL <br />$ <br />843,000 <br />PHASE II <br />5850 LF - 8" Gravity Line <br />$ <br />1870000 <br />Contingency, <br />Engineering, Legal, Admin.. Survey <br />____46.000, <br />TOTAL <br />$ <br />233,000 <br />PHASE III <br />New Pump Station <br />$ <br />16,000 <br />5600 LF - 8" Gravity <br />179,200 <br />2450 LF - 6" Force Hain <br />22,000 <br />Contingency, <br />Engineering, Legal, Admin., Survey <br />63.800 <br />TOTAL $ 280,000 <br />PHASE ,IV New Pump Station $ 15,000 <br />4000 LF - 8" Gravity 128,000 <br />2200 LF - 2" Force Hain 13,200 <br />Contingency, Engineering. Legal. Admin., Survey 46.800 <br />TOTAL $ 203,000 <br />PHASE V New Pump Station $ 15,000 <br />1500 LF - 8" Gravity 48,000 <br />1200 LF-- 2" Force Main 7.200 <br />Contingency, Engineering, Legal, Admin., Survey 21.800 <br />TOTAL $ 92.000 <br />CONSTRUCTION OF ENTIRE SYSTEM - TOTAL $ 1.651,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.