Orange County NC Website
2. name(s) and resume(s) of the person(s) who will direct <br />the project and attend public meetings; <br />3. names and resumes of other persons who will be working <br />on the project (consultants, subcontractors, etc.) and <br />description of the work to be done by other persons; <br />4. overall timetable and schedule by task for completion of <br />work elements; <br />5. list of previous consultant contracts and description of <br />experience in regional bicycle planning or essentially <br />similar projects; <br />6. list of any litigation involving your.-firm, any persons <br />working with your firm, or any of your consultants <br />involving any aspect.of your /their professional capacity <br />as planners, architects, landscape architects, engineers <br />or designers; <br />7. how your firm, if chosen, would provide the necessary <br />insurance requirements as outlined in the attached <br />Insurance Provisions for Professional Services; <br />8. description of study methodology (method by which the <br />tasks in the proposal will be addressed in the study); <br />and <br />9. A schedule and detailed estimate of time needed by local <br />planning staff for training, plan development, and <br />implementation. <br />Insurance Provisions <br />A. workers' Compensation: Coverage to apply for all <br />employees for statutory limits in compliance with the <br />applicable state and federal laws. The policy must <br />include employers' liability with a limit of $100,000 <br />each accident, $100,000 bodily injury by disease each <br />employee and $500,000 bodily injury by disease policy <br />limit. <br />B. Comprehensive General Liability: Shall have minimum <br />limits of $1,000,000 per occurrence combined single <br />limit for bodily injury liability and property damage <br />liability. This shall include premises and /or <br />operations, independent contractors, products and /or <br />17 <br />