Browse
Search
Agenda - 09-03-1991
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1991
>
Agenda - 09-03-1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2017 2:33:35 PM
Creation date
11/8/2017 11:35:10 AM
Metadata
Fields
Template:
BOCC
Date
9/3/1991
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
p ` <br /> 1; <br /> C3APANY NAM: Orange_County Public Works 5 <br /> PROJECT NAME: Northern Center <br /> LOCATION: Cedar Grove, NC <br /> Phase #15: On-site Ins ction <br /> The Project Manager shall visit the project site at such intervals <br /> as stipulated by the agreement between RTD Associates and the <br /> owner. During the on-site inspection, the quantities and quality <br /> of application shall be carefully inspected to verify strict <br /> ocnpliance with the contract specifications. <br /> Progress update reports shall be provided to the owner as required <br /> and shall consist of written and photographic documentation of work <br /> performed to date. <br /> Phase #16: pay Egguest Review Verificat' and <br /> upon receipt of the Contractors Pay Request, the Project manager <br /> shall review, verify, and approve properly substantiated payments <br /> due and forward to the Owner for payment. <br /> Phase #17: Substantial Caanpletion Verification and Punch-list Development <br /> At the point of substantial coupletion (90% to 95%) the Project <br /> Manager shall visit the job-site to inspect the work performed to <br /> date and establish a list of items which need to be corrected or <br /> ccopleted prior to project close-out. <br /> Phase #18: Final_I 'on and Pro'ect Hance V 'f'cation <br /> upon notification by the Contractor that all work has been <br /> caanpleted, the Project manager shall perform a final inspection to <br /> verify that all project and contract document requirements have <br /> been successfully satisfied and cmpleted. <br /> Phase #19: Assembly and Submission of Project Close-out Documents <br /> The Project Manager shall co-ordinate and assemble all project <br /> close-out documents, such as Warranties, Certificates of <br /> Cmpliance, etc., to be forwarded to the Owner, along with the <br /> approved final Contractor pay request. <br /> RTC Roof Engineering noiog,r <br /> Diagnostic and Design <br /> 5500 Exeaxwe Cenw Dr.,Suave IV <br /> Assodaies.PA. Charlotte,NC 28212 704.536.3322 <br />
The URL can be used to link to this page
Your browser does not support the video tag.