Browse
Search
Agenda - 09-03-1991
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1991
>
Agenda - 09-03-1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2017 2:33:35 PM
Creation date
11/8/2017 11:35:10 AM
Metadata
Fields
Template:
BOCC
Date
9/3/1991
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COMPANY NAME: Orange County Public Works 4 <br /> PROJECT NAME: Northern Center <br /> LIOCP,TION: Cedar Grove, NC <br /> Phase #11: Receipt and Tabulation of Bids <br /> on the pre-established time, date and place, the Project Manager <br /> shall assist the Owner's representative in receiving, opening, and <br /> tabulating the contractors' bids. <br /> A careful review of each bid shall be performed to verify the <br /> completeness, and extent of each bid as required by the bid <br /> package. The bids shall be tabulated to determine the apparent low <br /> bidder. <br /> pRQ7ECT SERVICES <br /> Phase #12: Pre-Construction Conference <br /> on the pre--established time, date and place, the Pre--construction <br /> Conference shall be conducted by the Project Manager. During this <br /> meeting, the full scope of work shall be reviewed by all parties <br /> present. other pertinent project requirements shall be discussed <br /> and agreed upon such as: staging areas, schedules, pay requests, <br /> cmumudcation channels, use of facilities, submittals, etc. <br /> Minutes of this meeting shall be recorded and will begone an <br /> integral part of the Project Manual. <br /> Phase #13: Submittal Review and royal <br /> Upon receipt of the submittal package, as provided by the <br /> Contractor, the Project Manager shall carefully review all material <br /> samples, material technical data, etc., to confirm o❑mpliance with <br /> the requirements of.the Specifications and Bid Documents. <br /> Phase #14: Verification of Material Delivery and Proper Storage <br /> The Project Manager shall visit the project site to inspect and <br /> verify the type, condition and quantities of materials stored are <br /> in compliance with the material requirements as specified. <br /> The type and quality of storage facility, covers, etc. shall be <br /> inspected to verify Proper Protection from damage and weather as <br /> specified. <br /> RTC Fko&E� Te&*x0oW <br /> Diggnostirs oW Design <br /> 5500 Executive Center Dr..Suite 177 <br /> Asxxkues.P.. C xAme,NC 26212 704.596.3.722 <br />
The URL can be used to link to this page
Your browser does not support the video tag.