Browse
Search
Agenda - 09-03-1991
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1991
>
Agenda - 09-03-1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2017 2:33:35 PM
Creation date
11/8/2017 11:35:10 AM
Metadata
Fields
Template:
BOCC
Date
9/3/1991
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
or <br /> i <br /> 1a <br /> Roof Engineering Technology <br /> RTD Diagnostics and Design <br /> 5500 Executive Center Dr., Suite 117 <br /> Associates, PA. Charlotte, NC 28212 704-536-3322, <br /> August 5, 1991 - <br /> Mr. Wilbert J. McAdoo PROJECT: Northern Center <br /> orange County Public Works Cedar Grove, NC <br /> P. 0. Hoc 8181 <br /> Hillsborough, NC 27278 <br /> Dear Ms. McAdoo: <br /> As a Professional Engineering Firm, specializing in the specific area of Roof <br /> Diagnostics, Engineering, Design, and Project Management, we respectfully <br /> request your consideration of the following proposal: <br /> We propose to provide our specialized Roof Engineering expertise as listed <br /> below, for the above referenced project. <br /> ENGIIIKKR NG DESIGN AM 922MWE ALMIIJIS�RATICN SERVICES <br /> Phase # 1: Project Plannin g an <br /> A Staffin <br /> A Project. Manager shall be selected within our firm to work closely <br /> with the owner's representative from inception to successful <br /> completion of the project. <br /> Phase # 2: Project Reguirements Review <br /> A careful and methodical study of the previously prepared Roof <br /> Diagnostic Report (as prepared by our firm) shall be performed to <br /> correlate the existing conditions, problems and viable solutions <br /> for corrective action. <br /> Phase # 3: Project Scheduling <br /> We shall prepare a tentative work sequence schedule for the Owner's <br /> representative, to establish time frames for all phases of <br /> Engineering, Design, and Construction work to be performed. <br /> Phase # 4: Performance Criteria Analysis <br /> Due to the sensitive and reactive nature of the roofing systems <br /> available today, a Performance Criteria Analysis shall be developed <br /> in order to determine the actual requirements of the roof membrane, <br /> insulation, attachment procedure, drainage, customized details, <br /> etc. <br /> This Performance Criteria shall consist of a site visit to evaluate <br /> all conditions which must be considered during the roof system <br /> selection process, in regard to building and owner requirements. <br />
The URL can be used to link to this page
Your browser does not support the video tag.