Orange County NC Website
b. PROPOSE STUDIES BE COMMISS FOR OTHER SHEDS? <br />c. COUNTY WATER VS NON- COUNTY? <br />d. OPPOSE CRIT AREA DEFIN <br />e. PROPOSE USING EXPAND CRIT AREA APPROACH <br />B. PRORITIZE WATER SUPPLIES (UPPER ENO) <br />1. WHAT RES TO BE BUILT, CONFLICT W OTHER GOALS. <br />2. MUST ASK STATE TO SPLIT BASIN IF WANT QUAL CLASSIF <br />3. QUESTIONS TO BE ANSWERED (READ) <br />a. PRIRRTIZE <br />b. PROPOSE SPLITTING BASIN TO EMC <br />c. PROPOSE 7 -MILE CREEK STAY WS--IV (LOWER ENO) <br />C. WHAT ABOUT LOWER ENO? <br />1.DURHAM STAFF PROP NO PROT AREA <br />2. IF NOT TO BE PROT, NO LOWER ENO SHED. <br />a. IF INTAKE TO BE PROT, ADOPT WSIV MEASURES <br />D. HILLSB COOP PLANNING <br />1. SMALL PT OF TRANS AREA ANDS LG PT OF RURAL IN LOWER <br />ENO (IF IT EXISTS) <br />a. REQUEST DIFF CLASS? <br />E. COMM /IND NODES IN WSHEDS (UPPER &LOWER ENO, S HYCO) <br />1. THREE NODES (READ FROM REPORT) <br />a. PROPOSE LOWER CLASSIF FOR S HYCO TO PROT NODE <br />b. PROPOSE LEAVING 7 -MILE CR IN WS -IV TO PROT CHEEKS <br />NODE <br />c. NO ACTION NEEDED FOR ENO <br />