Orange County NC Website
E. LIMITS ON NON -RES DEV <br />1. LIM IN WS -II AND WS -III, NONE IN WSIV (ALLOCATE) <br />2. ALLOCATE TO NODES, RCSC, 1ST SERVE, CONCURRENCY <br />F. CHANGES IN DENSITY <br />1. WSII 2 -ACRES THRU ALL SHED, WS-III GRIT, CG /LR? <br />2. DOWNZONE /AMEND WQCA, ADOPT WS ORD IN CG /LR, ZONE CG /LR <br />G. EXISTING LOTS <br />1. CURR DEFIN, ZONED AS EXISTING - SEE ADDENDUM? <br />2. ASK EMC TO-AMEND EX DEV - VESTED RIGHTS, <br />PROPOSE CHANGES TO DEFINITION OF EX DEV, WAIT AND SEE <br />H. EQUITY <br />1. DIFF TO DEFINE, UPSTREAM VS DOWNSTREAM, COMPENSATION? <br />2. INTERJURISD MTGS, COMPENS FROM DOWNSTREAM, PASS ON <br />COMPENS TO LDOWNRS, COMM A STUDY, ADOPT FOR PUBLIC GOOD <br />I. INTERJURISD DISPUTE RESOL /COOPERATION <br />1. SOME DISAGREEMTS (PERSON /DURHAM) <br />2. CALL FOR MTG OF EL OFFCIALS, USE PH PROCESS TO RESOLVE <br />J. IMPLMENT INTO ORD LANGUAGE <br />1. BIG Q: MATCH EX ORD OR TAKE NEW TACK? <br />2. (READ FROM REPORT) <br />XVI. WATERSHED SPECIFIC ISSUES (PG 64) <br />A. CRITICAL WATERSHEDS <br />1. HOW TO JUSTIFY MORE THAN MIN PROT IN UL,CANE,LR& FR? <br />PROPOSED LINKAGE TO TECHN STUDIES <br />2. CH AND OWASA TO REQ FOR UL AND CANE, DURH TO DO SAME <br />FOR LR /FR PER CDM STUDY? <br />a. JOIN W /OWASA AND CH IN REQ CRIT FOR UL /CANE? <br />