Browse
Search
Agenda - 08-20-1991
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1991
>
Agenda - 08-20-1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2017 11:36:20 AM
Creation date
11/8/2017 11:33:03 AM
Metadata
Fields
Template:
BOCC
Date
8/20/1991
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III- -D -2-g. <br />and/or vehicular access or circulation <br />6 <br />including road classification. <br />r eL an change in the Rrovision of services <br />such as water supply and wastewater <br />disposal. <br />1 any substantial chancre in the location of <br />utilities or other easements. <br />The subdivision shall be subject to review by <br />all aRplicable review agencies as is required <br />for original preliminar Plat a roval. If <br />all changes from the original approval are <br />considered minor changes, the Planning <br />Director or his/her authorized agent may re- <br />aRprove the preliminary plat, with condition <br />of aRRroval stated in a format which <br />substantially conforms to the Resolution of <br />ARProval ado ted by the Board of commissioners <br />when approving a preliminary plat. <br />Further Time Extensions <br />Only one administrative re-approval may be <br />approved for any subdivision. If a re- <br />approved Preliminary Plat expires,_ Where � <br />-pew44�d; -ham used, the developer shall <br />be required to resubmit a new Preliminary Plat <br />for the tract or portion thereof for which <br />approval has expired. The new plat shall be <br />subject to all applicable regulations in <br />existence at the time of resubmittal. <br />Provided, however, the development phasing <br />plan approved as part of the Preliminary Plat <br />(hereafter "the phasing plan ") may be amended <br />by the Board of commissioners upon application <br />by the subdivider. In determining whether to <br />approve an amended phasing plan, the Board of <br />commissioners shall consider: <br />(1) whether or not approval of other <br />diligently pursued regulatory <br />requirements can be obtained before the <br />expiration of the time periods <br />established in the phasing plan; and <br />(2) the quality of and length of time of the <br />experience of the subdivider in managing <br />development projects; and <br />(3), whether factors other than market <br />conditions and beyond the control.of the <br />subdivider caused a delay in meeting the <br />phasing plan; and <br />(4) whether the development project, if <br />completed consistent with the approved <br />
The URL can be used to link to this page
Your browser does not support the video tag.