Orange County NC Website
h. xflc <br />at'10n- Criteria <br />::graters e�d�'�lass <br />Name of Hack Creek <br />Name and 0;.: City of Ptebane <br />106 E. Washington 5t. <br />Mebane, Nc 27302 <br />i <br />>, Contact person, an;i i;hore number: <br />Robert L. Wilson, City Manager <br />1 3297 � <br />Total acreage c: the � atershed in your ju <br />risdiction (MTJ included): ^ <br />148 <br />5. Total acreage o` the watershed in the Critical Area that is residential: 663 <br />6. Total acreage of the watershed ou ;side of the Critical Area that is residential: I- <br />0 <br />Total acreage o: <br />?, .'ne watershed in the Critical Area that is non - residential: <br />ti <br />-r..nt mrrcave o: °'e w'a,ershed outside of the Critical Area that is non - residenal: 135 <br />1 <br />9. Does your junsc..:ion cu rcntly have Stonnwater Ccn�ol Devices in use wt t <br />t: o <br />residential - <br />1� goes �ourjurisc c;ion curratttly have 5tormwater Control Devices to use within I ;�0 <br />non-residential wate.shed areas? 4 1D.U. <br />I z .� . <br />11. =xisting residenr.11 density in the Critical Area: _ _ ^I„ �,. <br />I1C.U.f2a:. <br />12. L,ocaj government intent for future residential development in the Critical Area: <br />13. F-xisting residential density outside of the Critical Area: <br />j lam. l_oeall governmen: intent for futt:re residential development outside of <br />the Cntteat Area: <br />151. L.ocaj Gove,;.rnc;.'. intent for future non - residential development in the <br />Critical Area: <br />16. Local 11overnmcnt intent for future non- residential development outside of the <br />li <br />18 <br />I � <br />375 <br />Total acreage of fa:~nland within your ponton o, the waters a - -�_ ___I ^ - -_ <br />Percentage of the tc)'•al "'►ershed located within a state park or national park /forest: 1 0 <br />19. In your opinion. what watershed classification would the watershec quauly nor 1 W5-111 <br />under the adopted Rulz'? -.- - <br />20. What classification ..auld your local eovemmem prefer for the watershco.' txpt:un <br />The City of Mebane would prefer a WS -III Classification in the portion of this watershed <br />under our jurisdiction. The City has already zoned the critical area to 80,000 s5• f. <br />ttdn. lot size, which :s in cat-pliance With the W5-II or W5 -III Classification; however, <br />a significant portion of the watershed is within the city liarits, and considerable <br />developmertt already exists. The vacant areas Within our city lirdts that have existing <br />water and sewer service available would be severely restricted under a W5-II Classification; <br />while a *_III Classification would permit 1 D.U. /Ac. development or up to 30% built upon <br />with stornwater controls. The City feels that this flexibility should be available <br />in this area. <br />r <br />I <br />