Orange County NC Website
For.", <br />1 <br />Watershed Cl.assil±ication Criteria <br />1. Name of Watershed: Cape Fear Haw River #4 <br />2. Name and address of Jurisdiction: <br />Chatham County Pianning Department <br />P.G. Box 54 <br />Pittsboro NC 27712 <br />13. Contact person and phone number: <br />Keith Megginson 919/542 -8204 <br />4. Total acreage of Uic watershed in your jurisdiction (ET1 included): <br />' <br />i 42,862 <br />5. Total acreage of the watershed in the Cridcal Area that is residential: <br />1 127 Ac <br />1 <br />6. Total acrcal;c of the watershed outside of the Critical Area that is residcntial; <br />1 1,570 <br />7. Total acreage of dic watershed in the Critical Area that is non - residcntial; <br />b <br />i <br />I 34 <br />8. Total acreage of the watershed outside of the Critical Area that is non- residcntia: <br />�0 <br />9. Does your junsdiction currcndy have Stormwater Control Devices in use within <br />residcntial watershed areas? <br />I No <br />10. Does your jurisdiction currently have Siormwater Control Devices in use within <br />i No <br />non - residcntial watcrshcd areas? <br />11. Existing residential density in the Critical Area: <br />11 Eu /Ac <br />12. ]-,octal government intcnt for future residential developient in the Critical Area: <br />I <br />&IDu/2 Ae <br />13. Existing residcntial density outside of the Critical Area: <br />2 Ae <br />14. Local government intent for future residential development outside of <br />11 E i /Ac <br />the Critical Arc:t: <br />1 <br />15. Local Government intent for future non - residcntial development in the <br />Critical Area: <br />1' <br />16. Local government intent for future non - residential development outside of the <br />I� <br />Critical Area: <br />17. Total acreage of f.nland within your portion of the Watershed: <br />41,101 <br />18. Percentage of the total watershed located within a state park or national park /forest: <br />1 -0- <br />19. In your opinion, what watershed classification would the watershed qualify for <br />IWS III <br />under the adopted Rule? <br />20. What classification would your local government prefer for the watershed? Explain. <br />k�s III <br />The intake structure for the Pittsboro/Chatham County water system <br />will <br />be relocated up stream within the next two years. The location will <br />be <br />just north of the Haw River dam north of U.S. 15 -501. The nature of <br />the <br />existing, and planned /regulated critical area for the new intake is <br />greater <br />than two acres per dwelling unit - <br />02/28/91 <br />/C�•. %� ' <br />IA <br />AMtnonzinT, icnIturc�3 Daic Submitted <br />