Browse
Search
Agenda - 08-05-1991
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1991
>
Agenda - 08-05-1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2017 11:46:37 AM
Creation date
11/8/2017 11:30:25 AM
Metadata
Fields
Template:
BOCC
Date
8/5/1991
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
648
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M <br />b. Approval subject to conditions, or <br />c. Denial. <br />Failure to meet the criteria for site plan approval <br />listed in Article 14.3, and /or to address agency <br />comments solicited during plan review, will result <br />in denial of the application. <br />If a plan is approved subject to conditions, no <br />zoning permit or subsequent building permit shall be <br />issued until all conditions of approval have been <br />met to the satisfaction of Orange County. <br />At the option of the AVRlicant, a Site Plan may be <br />vested fora griod of not less than two 2 nor <br />,_ore than five 5) years. To become vested, a Site <br />Article 8 of this Ordinance._ <br />ARTICLE 8 - SPECIAL USES <br />Article 8. .11 - Time Limits on s ecial Qses <br />ConstrMction of a S ec'al Uses must start and iproceed within <br />twelve 12 months of the a val f the S ec"al Use Permit. <br />If no gonstructign has started within the stated time frame <br />the -SRecial Use Pe it becgmes D 11 and of no effect. <br />If g,-reauest is received before the permit expires, the Board <br />of County Commissioners for good cause shown may extend the <br />QxRiration deadline six (6 months upon the favorable <br />recommendation of the plannin Board. & changes shall be <br />made to the conditions of aRRrgval. only one such aRRroval <br />gf the time extension is geXMitted, and it shall be bas!gd on <br />evidence presented by the aDRlicant showingtat emits have <br />been Rurgued in a timely manner, and that dela s have <br />resul ed om fact-ors beygnd the control of th developer. <br />For devp=loRments which re 're aRproval of a S ec'al Use <br />not le s <br />than two 2 nor more th n five 5 ears. For <br />as s ecified in Article <br />8.8.27. <br />Article 8.8 - Regulations Governing Individual Special Uses <br />The regulations for each Class A and Class B Special Use are <br />divided generally into two sections: the first consists of <br />
The URL can be used to link to this page
Your browser does not support the video tag.