Browse
Search
Agenda - 08-05-1991
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1991
>
Agenda - 08-05-1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2017 11:46:37 AM
Creation date
11/8/2017 11:30:25 AM
Metadata
Fields
Template:
BOCC
Date
8/5/1991
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
648
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
26 <br />alternative to that presented to the Ordinance Review <br />Committee, and to the Planning Board on July 15, 1991. <br />The original proposal included a public hearing conducted by <br />Planning Staff for Site Plans, and a hearing before the <br />Planning Board prior to the recommendation to the Board of <br />Commissioners for Preliminary Plats. In order to recover <br />advertising costs, a fee of $200.00 was recommended since a <br />special public hearing notice would be required. <br />Subsequent to the Planning Board meeting on July 15, 1991, <br />the proposal was revised. <br />The original proposal focused on minimizing the amount of <br />time involved in obtaining approval, given that a public <br />hearing must be added to the process. The costs, to be paid <br />by the applicant, would be significant. The approval <br />procedures would also be more complex. The revised approach <br />incorporates the procedures into an existing public hearing <br />process (Special Use Permit Approval), and there is no <br />additional cost to the applicant. The time period required <br />for approval is longer, but the vesting procedure is not <br />required. It would be initiated only at the request of the <br />applicant. In addition, the vesting procedure may result in <br />project completion schedules which are considerably longer <br />than those allowed by the current ordinance provisions. The <br />procedure for obtaining a C1ass4Special Use Permit allows the <br />Board of Commissioners closer scrutiny of such requests and <br />to attach conditions to the approval. <br />EXISTING AND PROPOSED ORDINANCE PROVISIONS: <br />ZONING ORDINANCE <br />ARTICLE 22 - DEFINITIONS <br />Site S ecific Develo ment plan - A plan aRRroved by- the <br />Orange County Board of Commissioners following a_public <br />hearing and which describes, with reasonable certainty, the. <br />tyRe and intensity f use for a sRecific Parcel or Rarcels of <br />property located within the County's zoning jurisdiction. A <br />Site Specific Development Plan shall be deemed approved upon <br />the effective d t of the Board of Commissioners'-action. <br />Site Plans, Special Use Permits, Planned Developments, and <br />Preliminary Subdivision Plats may be aRRrov@d as Site <br />Specific Development Plans in accordance with Section 8 of <br />the Orange County Zoning Ordinance._ Site Specific <br />Develop ment Plans are re 'red only where an aRRlicant wishes <br />to vest his DrORerty rights fora eriod lon er than that <br />otherwise permitted by this Ordinance. <br />Vested Right - ThS right to undertake and complete the <br />deve o ment of a PrgRerty under the terms and conditions of <br />An aRproygd Site Specific Develo ment Plan rovided <br />however failure to abide by such terms and conditions shall <br />result in a forfeiture of vested rights. The vested right is <br />
The URL can be used to link to this page
Your browser does not support the video tag.