Browse
Search
Agenda - 08-05-1991
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1991
>
Agenda - 08-05-1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2017 11:46:37 AM
Creation date
11/8/2017 11:30:25 AM
Metadata
Fields
Template:
BOCC
Date
8/5/1991
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
648
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13 <br />ORA -AGE COUN- T Y <br />HILL- snOftOUGH <br />NORTH C: \ROT -1N' \ _ <br />- . _- �rrtaLf�sfui �S2 <br />May 16, 1991 <br />Alois Callemyn,. RLS <br />PCA Engineering <br />104 North Churton Street <br />Hillsborough, NC, 27278 <br />Dear Mr. Callemyn: <br />This letter is to inform you that I am in general <br />agreement with the proposed sewer design prepared by PCA for <br />Cobb's Mobile Home Park. If you will recall, I have noted <br />several minor revisions to the plans and specifications. As <br />of this date, I have not seen those revisions for my final <br />approval. In addition, I have indicated in previous <br />conversations with you that an ownership, maintenance and <br />warranty agreement between the County and Mr. Cobb will have <br />to be developed. This agreement will need to address and <br />codify the conditions of the construction warranty and the <br />hold - harmless guarantee from Mr. Cobb to the County in regard <br />to short and long term construction damage to existing <br />property and structures. The agreement will have to be <br />formalized and signed as a precondition to the County's final <br />approval and acceptance of the project. The County Attorney <br />is working on a draft of this agreement at the present time. <br />other preconditions to the County's final approval of this <br />j-�c �- ar�tha�` the~ t�'al r -IIE%'i- anc�-N CDO <br />permitting requirements for the design and installation of <br />the sewer system. Once all of these preconditions are met, <br />the County will give its final project approval and will <br />agree to allow Cobb's Mobile Home Park access to the County <br />sewer system and will accept maintenance responsibility for <br />Mr. Cobb's system. <br />
The URL can be used to link to this page
Your browser does not support the video tag.