Browse
Search
Agenda - 08-05-1991
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1991
>
Agenda - 08-05-1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2017 11:46:37 AM
Creation date
11/8/2017 11:30:25 AM
Metadata
Fields
Template:
BOCC
Date
8/5/1991
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
648
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Maintenance Agreement for the project. 2 <br />Orange- Alamance Water System, Inc. has indicated they <br />will furnish water to the project and maintain the <br />water lines. <br />The Town of Hillsborough has indicated their agreement <br />to provide sewage treatment to the project. <br />The developer will pay for all water and sewer <br />improvements. The proposed gravity sewer line will <br />flow into an existing gravity line in Richmond Road <br />(SR 1312). <br />Construction plans for Rod and Reel Road and Angler <br />Lane have been approved by the North Carolina <br />Department of Transportation. Revisions to approved <br />plans may be made by NCDOT if field conditions <br />warrant. <br />The Soil Conservation Service indicates Georgeville <br />silt loam and Lignum silt loam soils on the site. <br />Georgeville has slight limitations for building site <br />development and Lignum has severe limitations. To <br />ensure compliance with the N.C. State Building Code <br />the Building Inspector may require soil compaction <br />tests on some lots prior to the placement of any <br />structures. Soils may have to be compacted before <br />placement of structures. <br />The orange County Subdivision Regulations require a <br />Type D 50' land use buffer along Highway 70 on lot #1. <br />The applicant is requesting a waiver of the Type D to <br />a Type B (301) buffer. The waiver would involve the <br />dimensional requirements and not the landscaping <br />(screening) requirements. If approved, this waiver <br />would allow a mobile home to be placed on lot #1. <br />The Concept Plan was approved by the orange County <br />Planning Board on November 19, 1990 with four <br />conditions: <br />1. All lots shall have access restricted to the new <br />subdivision road. <br />2. The developer shall provide a sewer option that <br />will be approved by the orange County Engineer. <br />Plans and specifications for the internal <br />sewerage system shall be approved by the State <br />Division of Environmental Management and the <br />Orange County Engineer. <br />3. If a pumping situation is proposed with private <br />sewer easement, maintenance documents shall be <br />submitted and approved by the County Attorney to <br />ensure maintenance of the entire sewer system in <br />the subdivision. <br />
The URL can be used to link to this page
Your browser does not support the video tag.