Browse
Search
Agenda - 08-05-1991
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1991
>
Agenda - 08-05-1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2017 11:46:37 AM
Creation date
11/8/2017 11:30:25 AM
Metadata
Fields
Template:
BOCC
Date
8/5/1991
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
648
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
+ ORANGE WATER AND SEWER AUTHORITY 9 <br />POLICY FOR EXTENDING MATER AND SEWER LINES <br />INTO UNIVERSITY LAKE WATERSHED <br />Purpose <br />This policy sets forth principles and guidelines for the extension of the <br />Authority's water and sewer facilities and services into the University Lake <br />watershed. <br />Background <br />In 1987 Orange Water and Sewer Authority commissioned the Camp Dresser & McKee <br />University Lake Watershed Study to provide the Board of Directors and local <br />governing bodies with a reliable basis for implementing land management controls <br />to help assure short and long term protection of the University-Lake water <br />supply. While the study was being conducted and its recommendations were being <br />considered by the local governing bodies, the Authority maintained a moratorium <br />on water and sewer extensions into the watershed. <br />The study, which was completed in March 1989, evaluated a range of development <br />scenarios and utility service options, and determined that low density <br />residential development served by individual wells and septic systems would <br />present the least overall risk to University Lake water quality. Many of the <br />CDM findings and recommendations were incorporated into local land management <br />plans, development ordinances, and regulations amended by the Orange County Board <br />of Commissioners and Carrboro Board of Aldermen in April and May, 1990. Among <br />the standards for new development were 5- and 2 -acre minimum lot requirements, <br />impervious surface limits, and revised stream buffer setbacks. <br />Additionally, Carrboro and Orange County prohibited community alternative <br />wastewater treatment and disposal systems, as well as public water and sewer <br />service, except to correct officially declared health hazards. The County <br />adopted additional language allowing reconsideration of its utility restrictions <br />after special studies that the County expected to be completed by April 30, 1991. <br />Although Chapel Hill has no planning and zoning jurisdiction in University Lake <br />watershed, the Town Council has maintained a consistent policy against the <br />extension of public water and sewer service into the watershed. <br />Orange Water and Sewer Authority's Mission and Goals Statement (December, 1988) <br />includes a commitment "to be guided by the land management plans approved by the <br />government units in the area the Authority serves." <br />Policy <br />Consistent with findings of the Camp Dresser & McKee University Lake Watershed <br />Study, and in accordance with recent positions adopted by Carrboro, Chapel Hill, <br />Certain Carrboro regulations had not been enacted as of the April 25, <br />1990 effective date of this OWASA policy, but were proposed for public hearing <br />on May 15, 1990. <br />
The URL can be used to link to this page
Your browser does not support the video tag.