Browse
Search
Agenda - 06-25-1991
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1991
>
Agenda - 06-25-1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2017 11:04:11 AM
Creation date
11/8/2017 10:47:00 AM
Metadata
Fields
Template:
BOCC
Date
6/25/1991
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
806
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 306 FORM OF CONSTRUCTION CONTR)►CT <br />(ALL PRIME CONTRACTS) <br />THIS AGREEMENT, made the - 25th day of June <br />J in <br />the year of 19_U by and between C. J. Kern, Contractor Inc., <br />Greensboro, NC. <br />hereinafter called the Party o', the First Part and the SXX Xd r, <br />rthx xt i l� 'ti<xt�4 County of Orange, North Carolina <br />hereinafter called the Party of the Second Part. <br />WITH $SETH: <br />That the Party of the First Part and the Party of 'the second <br />Part for the consideration herein named agree as follow$: <br />1. Scope of Work: The Party of the First Part shall furnish <br />and deliver all of the materials, and perform all of the work in <br />the manner and form as provided by the following enumerated plans, <br />specifications and documents, which are attached hereto and made a <br />part thereof as if fully contained herein: Advertisement, In- <br />structions to Bidders, General Conditions, Supplementary General <br />Conditions, Specifications, Accepted Proposal, Contract, Perfor- <br />mance Bond, Payment Bon_, Power: of Attorney, workmen's Compensa- <br />tion, Pub_,c Lia�y?ity, Property Damage and Builder's <br />rance Certificates, Risk Insu- <br />���kx���gt���x��Xx�������x�,�. <br />kb�l�XiDeCxCi�xSXX�x(���x, and Drawings, entitled: <br />r e Coiant Government Services Center <br />Hi s orou , <br />Consisting of the following shuts: For General Construction work on <br />C -1 thru C -6 S -1 thru S- - t ru - ,Dated: May May ]:6, 1991 <br />and the following addenda: <br />Addendum No. 1 <br />Addendum No. 2 <br />Dated 5/29/91 Addendum No. Dated <br />Dated 5/31/91 <br />Addendum No. Dated <br />Addendum No. 3 <br />Dated 6/3/91 - <br />�_ Addendum No. Dated <br />Addendum No. ___4_ Dated — .L.6 4 91 <br />�_— Addendum No. Dated <br />2. That the Party -of the First part shall commence work to <br />be Performed under this Agreement on a date to be specified in a <br />written order of the Party of the Second Part and shall full <br />complete all work hereunder wit;iin } <br />f��acncx * <br />xcX��ttaucxg�g�gxx�� <br />or each day in excess thereof, <br />liquidated damages shall be as stated in Supplementary General <br />Conditions. The Party of the First Part, as one of the <br />considerations for the awarding of this Contract, has furnished to <br />the Party of the Second Part a construction schedule setting forth <br />planned progress of the project broken down by the various divi- <br />sions or part of the work and by calendar days. In the event that <br />the progress of the work is riot maintained on schedule by the <br />Party of the First Part, or in the event the work is not completed <br />within the time above specified, the Party f the 5 and Part may <br />* 365 calendar days from notice -to- proceed for P�iase I. Se-pond II will <br />be completed 60 calendar days after acceptance of Phase I and a two - <br />week period for moving offices. <br />3 -47 <br />
The URL can be used to link to this page
Your browser does not support the video tag.