Orange County NC Website
SECTION 306 FORM OF CONSTRUCTION CO2MMACT <br />(ALL PRIME CONTRACTS) <br />THIS AGREEMENT, made the 25th day of `June _ in <br />the year of 19L9 by and between Quality Electric Co., Inc. <br />Durham, NC. <br />hereinafter called the Party of . the First Part and the S j Xdg <br />?►'CFCic�6.K.Xifh�k��cxc� County of Orange, North Carolina <br />hereinafter- called the Party of the Second Part. <br />WITNEB &ETH: <br />That the Party of the First Part and the Party Of the second <br />Part for the consideration herein named agree as follows: <br />1. Scope of Work: The Party of the First Part shall furnish <br />and deliver all of the materials, and perform all Of the work in <br />the manner and form as provided by the following enumerated plans, <br />specifications and documents, which are attached hereto and made a <br />part thereof as if fully contained herein: Advertisement, in- <br />structions to Bidders, Genera]. Conditions, Supplementary tGeneral <br />Conditions, Specifications, Accepted Proposal, Contract, Perfor- <br />mance Bond, Pavmen, gone power of Attorney, workmen's Compensa- <br />tion, Public LiaVl?it}, Property Damage and Builder's Risk Insu- <br />rance certificates <br />03exZr c�axecxc¢�x c x pc � � 9Xxxr �€ �cx <br />��, and Drawings, entitled: <br />s <br />e oroug Count Government ervices Center <br />i , <br />Consisting of the following sheets: Electrical work as shown on CO, <br />- E- th u E -6 A -1 t h r u A- , an` peci ica ions a e <br />1691 - <br />Dated: May 16, 1991 <br />and the following addenda: <br />Addendum No. _ 1 Dated V29/91 <br />Addendum tao. Dated <br />Addendum No, 2 Dated 5/31/91 <br />Addendum No, Dated <br />Addendum No. 3 Dated 6/3/91 <br />Addendum No. Dated <br />Addendum No. _-4` Dated 4 91 <br />--6 L� Addendum No. Dated <br />2. That the Party ,of the First Part shall commence work to <br />be performed under this Agreement on a date to be specified in a <br />written order of the Party of the Second Part and shall fully <br />complete all work hereunder within <br />��Ca;:atx 66Mi4MMMe <br />XXxVCX�xZ6xxd34�S For each day in excess thereof, <br />liquidated damages shall be as stated in Su lementa <br />Conditions. The Party of the First Part, as one of General <br />considerations for the awarding of this Contract, has furnished to <br />the Party of the Second Part a construction schedule setting forth <br />planned progress of the project broken down by the various divi- <br />sions or part of the work and by calendar days. In the event that <br />the progress of the work is not maintained on schedule by the <br />Party of the First Part, Or in the event the work is not completed <br />within the time above specified, the Party f the Second art may <br />*.365 calendar days from notice -to- proceed for PMse I. Phase F Will <br />be completed: 60 calendar days after acceptance of Phase I and a two - <br />week period for moving offices. <br />3 -47 <br />